RE: Delivering a smart and secure electricity system: government consultation

@derek-m - The electricity supply industry relies on 'diversity' with regard to phase balancing and hopes for a reasonable balance of loads across t...

3 months ago
Reply
RE: Delivering a smart and secure electricity system: government consultation

Here is NGED's policy document: NGED Standardisation of Fusing to 80A My 100A service head was replaced with an 80A one last year after I rashly rep...

3 months ago
Reply
RE: EV charger installation question – I don't want to bury the cable

@transparent If it's a Podpoint Solo EV charger, a quick look at the installation guide suggests it has has a form of PEN fault detection and can be...

3 months ago
Reply
RE: Delivering a smart and secure electricity system: government consultation

At present, the focus of many people - I'm thinking of PV and domestic battery owners here - is on export limitation to the grid. (Call me a cynic, b...

3 months ago
Reply
RE: EV charger installation question – I don't want to bury the cable

@hem Depending on the charger you install, an option may be to use an SWA cable with an integral cat5 cable. This may be used either for an intern...

3 months ago
Reply
RE: MCS Heat Loss Calculations

I don't know about 'rules'; I did my calculations by first principles, considering where any heat would be lost. Basically, first floor ceiling losse...

3 months ago
Reply
RE: Octopus (the grid) is my battery

I've just looked back on my bill for 15 Feb - 8 March and I was charged 14.05p/kWh +VAT. I can't understand these people who insist they won't have a...

4 months ago
Reply
RE: Installing a heat pump in a Grade II listed property

@cathoderay - I have similar problems with my Lounge and Kitchen, although not to the same extent as @showi . I don't have high ceilings but I had no...

4 months ago
Reply
RE: Installing a heat pump in a Grade II listed property

I'll ask the obvious question, then. Did the OE chap offer a detailed report on their heat loss calculations? Apparently not.

4 months ago
Reply
RE: Smart meter installation – seamless or a potential nightmare?

Yes, I think so. To be fair, I had downloaded my half-hourly data from n3rgy rather than my supplier's portal, but I have just done so now and for t...

4 months ago
Reply
RE: Smart meter installation – seamless or a potential nightmare?

@transparent I have tried this for my billing period since 9th February. Whilst I have half-hourly meter readings from the National Grid Gas Data Po...

4 months ago
Reply
RE: Smart meter installation – seamless or a potential nightmare?

@toodles The difference on my bill is similarly beneficial, so I'm happy to let sleeping dogs lie 😉

4 months ago
Page 2 / 6
Share:

Join Us!

Latest Posts

Members Online

 No online members at the moment

x  Powerful Protection for WordPress, from Shield Security
This Site Is Protected By
Shield Security