RE: Electricity price predictions

It would be better to say "70GW of deliverable capacity" Assuming that there's no load shedding, the actual Demand peak in winter is about half of t...

5 days ago
Reply
RE: Renewables & Heat Pumps in the News

Can I point the discussion to a transcript of Oral Evidence to the Commons Select Committee on ESNZ on 31st January 2025. One of the three witnesses...

5 days ago
Reply
RE: Renewables & Heat Pumps in the News

As I read it, the protests were about the requirement for lots of new 400kV transmission towers to transfer the electricity to London. Those protest...

6 days ago
Reply
RE: Renewables & Heat Pumps in the News

I echo those comments from @jamespa The media seems to report on what is currently happening, particularly when something hasn't worked out as hoped...

6 days ago
Reply
RE: Electricity price predictions

Erm... obtaining planning consent is rarely a problem for applications which are energy-based. Existing Planning Regulations are inadequate to addre...

7 days ago
Reply
RE: Installer Fitted 9kW Instead of 11kW Heat Pump and Changed MCS Paperwork - What do I do?

Ian Rippin, CEO of MCS, gave oral evidence to the Select Committee on Energy in Feb'25,for which the transcript of oral evidence is available here.The...

7 days ago
Reply
RE: Electricity price predictions

The figures above already allow for that. Peak demand in the middle of winter is around 35GW.NESO wants 70GW of 'available generation/storage' in or...

7 days ago
Reply
RE: Installer Fitted 9kW Instead of 11kW Heat Pump and Changed MCS Paperwork - What do I do?

The CEO of MCS has appeared before the Select Committee on several occasions already.

1 week ago
Reply
RE: Electricity price predictions

By 2030 both turbines at Hinkley-C will be running, which comes to 3.26GW Hydro is the highest level of renewable generation because it can be contr...

1 week ago
Reply
RE: Installer Fitted 9kW Instead of 11kW Heat Pump and Changed MCS Paperwork - What do I do?

If you search for "Microgeneration Certification Scheme appointed by" there are lots of announcements since they ceased to be run by BEIS in 2018. A...

1 week ago
Reply
RE: New Fogstar 15.5kWh upright solution

I think you might like to read some of the online reviews of Datou Boss equipment before using them for price comparison. Look at this discussion on...

1 week ago
Reply
RE: New Fogstar 15.5kWh upright solution

Fogstar released their own range of storage battery enclosures a couple of years ago. They are available as a bare steel box without internal cablin...

1 week ago
Page 2 / 229
Share:

Join Us!

Latest Posts

Click to access the login or register cheese
x  Powerful Protection for WordPress, from Shield Security
This Site Is Protected By
ShieldPRO