Recent Posts
 
Notifications
Clear all

Recent Posts

 |  Forums  |  Topics
Page 11 / 178
Posts with their shortened content
JamesPa RE: Electricity price predictions  

By JamesPa, 2 days ago

  OK, thanks for confirming, thats not what you appeared to say, but makes more sense. Do I correctly interpret your latest comment as meaning that NESO is required to meet demand, but that this require...
bontwoody RE: 6 meter run of pipe from the outside to the UniSTOR Pure 200lt cylinder: do I go plastic or copper?  

By bontwoody, 2 days ago

  I would agree 22mm plastic can move close to 5kW so would be ample for your 3.5kW output
RE: Plastic or Copper  

By upnorthandpersonal, 2 days ago

  Go with PEX/PE-RT/Multilayer Pipe (plastic in other words). You have a lower thermal conductivity than copper, so you get better performance. It's typically also easier to install and you won't have p...
trebor12345 6 meter run of pipe from the outside to the UniSTOR Pure 200lt cylinder: do I go plastic or copper?  

By trebor12345, 2 days ago

  Regarding the install of a Vaillant 3.5Kw arotherm plus. I have a 6 meter run of pipe from the outside to the UniSTOR Pure 200lt cylinder: 1 meter in pipe insulation outside, 2 meters outside in plas...
MK4 RE: Midea R32 Monobloc MHC-V12W in 1989 Detached House: Noise from Pipes/Airing Cupboard, DHW Schedule Not Always Heating – Advice Needed?  

By MK4, 2 days ago

  I think it means it runs at the same constant speed all the time. From the link below you can download the installation and operation manual, see pages 13 to 15 (I am using a tablet right now and I ca...
Majordennisbloodnok RE: Designing heating system with air to water heat pump in France, near Lyon  

By Majordennisbloodnok, 2 days ago

  I'm certainly not sure but I am more hopeful. I remember the time long ago when there were competing hardware standards for expansion boards in PCs, with Compaq and IBM trying to impose their propriet...
Transparent RE: Electricity price predictions  

By Transparent, 3 days ago

  The causal link is that Ofgem developed the TM04+ process, not that they are responsible for the number of data centres. It's NESO, not Ofgem, who are required to ensure that the electricity demand is...
bobflux RE: Designing heating system with air to water heat pump in France, near Lyon  

By bobflux, 3 days ago

  Designing a good programming language is extremely difficult, very few succeed. Thus application specific languages like HA's automations are red flags. I looked into ways to neatly integrate scripts...
JamesPa RE: Electricity price predictions  

By JamesPa, 3 days ago

  the explanation that then follows is entirely based on the actions of OFGEM I would challenge the causal link you seem to imply (essentially that OFGEM is responsible for the high number of data cent...
RE: Peak Energy Products V therm 16kW unit heat pump not reaching flow temperature  

By DaveC, 3 days ago

  Hi @johnd, we have the original installer coming round tomorrow to discuss what they can do next. Since we've already claimed the BUS grant a replacement ASHP would be at full price, so hoping the ins...
Page 11 / 178
Share:

Join Us!

Latest Posts

Click to access the login or register cheese
x  Powerful Protection for WordPress, from Shield Security PRO
This Site Is Protected By
Shield Security PRO