Search with Wattson
Notifications
Clear all

Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!

Heat Geek Zero Disrupt: Are We Sleepwalking Into Another Race to the Bottom?

98 Posts
17 Users
47 Reactions
12.4 K Views
(@l8again)
Estimable Member Member
Joined: 9 months ago
Posts: 63
 

@Editor is correct. Under MCS, installers are required to provide a flow temperate and an ESTIMATED SCOP as part of the survey. However,……

A key difference here is that the Heat Geek SCOP is not estimated - it is a minimum performance guarantee. The actual installation design work is done by Heat Geek HQ after it has received the survey results and the customer’s selection of one of three performance options. One of the outcomes of the design work is the calculation of the system’s maximum flow temperature. This is the reason why there is no flow temperature in the survey, and why it appears along with the SCOP on the MCS Certificate. This may be complete rubbish but it is what my research is suggesting.

Space and HW heating calculations appear both in the survey and on the MCS Certificate.

 



   
👍
2
ReplyQuote
JamesPa
(@jamespa)
Illustrious Member Moderator
Joined: 4 years ago
Posts: 5496
 

@editor 

In principal I agree with most of what you say, most particularly the bit about the nature of the guarantee being key.  However there is one possible (but key) exception/subtly to my agreement:

 

There are two possible and legitimate scenarios where it might not be possible, or at least where there is an understandable and arguably legitimate reluctance, to provide a specified flow temperature etc namely:

 

1) the design is done by a demonstrably good tool that does not reveal its inner workings (AI/machine learning)

2) the design has a degree of uncertainty, or even risk, associated with it

 

I suspect that #1 applies in many cases, including Heat Geeks.  Number 2 definitely applies to all heat pump installations.    Of course #2 is only truly acceptable from a customer point of view if the supplier is prepared to cover that risk/uncertainty by means of a guarantee, making retrospective changes if necessary.  Note that most installers, and the MCS rules instead deal with this risk by insisting on specifying lots of design detail, ie transferring the risk to the customer!  

 

There is a third possible scenario which may also apply namely

3) the design may risk violating one or more arbitrary rules imposed by MCS notwithstanding the satisfactory performance, and providing design details would reveal that thus 'incriminating' the supplier.

Im not saying that this scenario exists in Heat Geek's case, but it very likely did with my (successful) installation.

Finally there are possibly commercial reasons.  At present HG has a commercial advantage with intelligence it has gained from monitoring its past installations.  This allows it to 'trim' specifications (and thus its own costs) whilst offering a performance guarantee.  That commercial advantage is diluted if it reveals too much detail.

 

Any or all of the above may explain a reluctance to provide the design detail which the customer shouldn't need.

Im should be clear that I am neither defending nor attacking Heat Geek, just looking at it another way!  I personally think we should be spending time understanding (and critiquing, albeit with a realistic hat on) the nature of the guarantee rather than worrying too much about design detail.  


This post was modified 33 minutes ago 2 times by JamesPa
This post was modified 23 minutes ago by JamesPa

4kW peak of solar PV since 2011; EV and a 1930s house which has been partially renovated to improve its efficiency. 7kW Vaillant heat pump.


   
👍
1
ReplyQuote
Page 9 / 9
Share:

SPONSORS

Join Us!

Installer Finder

Degrees of Separation

Latest Posts

SPONSORS

Click to access the login or register cheese
Protected By
Shield Security PRO