Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!

JamesPa
JamesPa
@jamespa
Moderator
Illustrious Member
Joined: Apr 3, 2023
Last seen: Oct 8, 2026
Topics: 27 / Replies: 5468
Reply
RE: My NIBE ASHP Nightmare: No Commissioning, High Bills and a Hostile Installer

The link didn't work for me. G3 is the building regulation related to safety of unvented cylinders. It requires certain safety measures be implement...

9 months ago
Reply
RE: Renewables & Heat Pumps in the News

Not really a U turn, just a change of the closure date. I think the last sentence gives a clue to why, and anyway its easy to guess that contract/com...

9 months ago
Reply
RE: New Solar, Batteries, Air Source and Under Floor Heating advice please

Sadly no. ASHPs (and boilers in fact) are most efficient if they are working and producing heat for long periods, preferably continuously. Unfortun...

9 months ago
Reply
RE: New Solar, Batteries, Air Source and Under Floor Heating advice please

All noted. Given the construction I would be wary of relying on 'batch heating' so a heat pump well matched to the loss is desirable. If you are int...

9 months ago
Reply
RE: My NIBE ASHP Nightmare: No Commissioning, High Bills and a Hostile Installer

If you measure temps at A, B, C and D in my diagram above it should be possible to work out exactly what is going on. Best done on (a) a very cold da...

9 months ago
Reply
RE: New Solar, Batteries, Air Source and Under Floor Heating advice please

I'm really struggling to imagine that the house you describe with the insulation you describe is 10-11kW unless you the design temperature where you a...

9 months ago
Reply
RE: New Solar, Batteries, Air Source and Under Floor Heating advice please

Prior to installing an ashp I had I diverter. However I disconnected it once the ashp was installed. Cheaper by far to heat dhw at 8p per kWh and a ...

9 months ago
Reply
RE: Ecodan Zone 2 Mitshibishi thermostat Auto Adapt

Welcome to the forum and you are thinking in the right way, ie about reducing the complexity and number of controls. The first questionto answer is ...

9 months ago
Reply
RE: Grant Aerona3 10Kw cooler flow during cold weather

This depends on the system design so cant be certain without further details but UFH often has a max FT of ~35. Before we dive too deeply can I ask,...

9 months ago
Reply
RE: Ideal HP290 14kW ASHP - how to optimise

Possibly the thermostat is connected in a way that means, with only one contact, it operates the same as Method B. But yes its confusing.

9 months ago
Reply
RE: Ideal HP290 14kW ASHP - how to optimise

@cmartinbwmba   Method A I cant quite translate for certain but it seems priority mode and non priority mode refer to heating and cooling....

9 months ago
Reply
RE: Air Changes per Hour - ACH and the MCS requirement

sounds possible but of course wind only blows from one direction and its not from the inside of the house! I think that might be the drift of the comm...

9 months ago
Page 124 / 459
Share:

SPONSORS

Join Us!

Installer Finder

Degrees of Separation

Latest Posts

SPONSORS

Click to access the login or register cheese
Protected By
Shield Security PRO