Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!
battery storage without solar
Posted by: @etchedpixelsThe list of notifiable work depends upon which UK country a tiny bit but
"12.—(6A) A person intending to carry out building work in relation to which Part P of Schedule 1 imposes a requirement is required to give a building notice or deposit full plans where the work consists of—
(a) the installation of a new circuit;
(b) the replacement of a consumer unit; or
(c) any addition or alteration to existing circuits in a special location.
Thank you for sharing.
We employed a reputable NICEIC firm to replace our consumer unit. Not only did they not give any building notice but they tried to evade the requirement to issue us with the electrical certificate!
My conclusion is that, if they did not notify a CU replacement, they are very unlikely are they to notify a new circuit. This seems to be standard practice.
Unfortunately this section of the Part P does not mention batteries, will need to do some more digging. To be clear, I also expect most of the work needs to be done by an electrician. What I am not clear is whether the electrician needs a special qualification for battery work (and I mean NICEIC or NAPIT, not MCS).
8kW Solis S6-EH1P8K-L-PLUS hybrid inverter; G99: 8kW export; 16kWh Seplos Fogstar battery; Ohme Home Pro EV charger; Vaillant Arotherm Pro 7kW; 100Amp head, HA lab on mini PC
As of October 1st they need specific qualifications to do solar, EV charger or battery work. It was changed in EAS 2024.
There's now a new regulators gravy train, sorry I mean training requirement for
- Performing an EICR (presumably it's "how not to get caught doing it over the phone")
- EV charging
- Solar PV
- Electrical Storage Systems
The Sparx I know all think it's yet another money grab or would I suspect agree with you that professional bodies are useless on enforcement and just want to make money on an endless qualification gravy train. On numbers we are going to have a serious shortage of sparkx in a few years. The older ones are throwing in the towel with the infinite money pit caused by the regulators and the newer ones simply aren't bothering with the qualifications needed to self sign.
The more interesting part though in all of this is that the SEG guidance for licensees says
3.3.At a minimum, a SEG licensee must offer one SEG tariff that is available to all SEG-
eligible installations
4.1.A SEG licensee is only required to accept a request for SEG payments if the
installation meets the eligibility requirements detailed in this chapter.
4.6. For PV, wind and micro-CHP installations up to 50kW, generators should
demonstrate that the installation and installer are suitably certified. An applicant
may have an installation certificate to demonstrate this. This may be a
Microgeneration Certification Scheme (MCS) certificate, but the SEG recognises
other schemes may be equivalent to MCS.
4.7.The SLCs define an equivalent scheme as a scheme accredited in accordance with
EN 45011 or EN ISO/IEC 17065:2012.
4.7 if you turn it into plain English almost certainly means any electrician now qualified to install your battery is qualified in accordance with 4.7 so what happens when this gets tested a bit more and the MCS get cut out will be entertaining.
-
Nook batteries from Octopus
4 weeks ago
-
Renters and batteries
4 years ago
-
Batteries Cold Weather
4 years ago
- 27 Forums
- 2,811 Topics
- 66.5 K Posts
- 1,779 Online
- 7,217 Members
Join Us!
Installer Finder
Degrees of Separation
Latest Posts
-
RE: Why don't people choose heat pumps?
It's swings and roundabouts - during off-peak periods t...
By Temperature_Gradient , 49 minutes ago
-
RE: The Changing Jet Stream Could Challenge UK Air Source Heat Pumps
... And that's being generous! I'll tell you a littl...
By SusannaSaunders , 7 hours ago
-
RE: Adding data centre electricity costs to domestic energy bills?
never ceases to amaze me.. Keeping steel works going ...
By Batpred , 8 hours ago
-
RE: Electricity price predictions
great session Reminds me why some politicians can be ha...
By Batpred , 8 hours ago
-
RE: Boiler Upgrade Scheme funding reduced by circa £750 million in 2026 budget
Absolutely agree. The massive Hager CU my vaillant requ...
By Batpred , 8 hours ago
-
RE: How much of your renewable and home setup would still work if the internet went down?
absolutely agree. even if many providers see that extra...
By Batpred , 9 hours ago
-
RE: Octopussy cosy 6 experience
People who have a Cosy appear generally to be happy wit...
By JamesPa , 12 hours ago
-
I thought the cr*p came first and the biofuel came afte...
By Majordennisbloodnok , 16 hours ago
-
RE: Aerotherm and weather compensation
@jamespa I replied yesterday with detailed readings whi...
By DavidB , 2 days ago
-
RE: Marvel Heating liquidation
@editor This is an important point. each winter, you...
By davidnolan22 , 3 days ago
-
RE: Solar Power Output – Let’s Compare Generation Figures
Very nice. we’ve been super soggy here, but rather m...
By Papahuhu , 4 days ago
-
RE: DIY powerflushing tutorial
Interesting! I toyed with the idea too. But I installed...
By bobflux , 4 days ago
-
RE: 15kw pump for 225m2 1990's house - over kill?
@seaviews Agree with the others on sequence: loft first...
By mk1234 , 4 days ago
-
RE: Vaillant ecoTEC Plus - Flow Temp and Set Up
Heating been on for 4 weeks now, continuous. It's 6C o...
By trebor12345 , 5 days ago