Search with Wattson
Activity
 
Notifications
Clear all

Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!

Rob of York
@rob-of-york
Member
Estimable Member
Joined: Aug 25, 2026
Last seen: Oct 4, 2026
Topics: 7 / Replies: 91
Reply
RE: Starting Our Heat Pump Journey: 1962 build 3 bed detached house

@ian-s One interesting difference between your two quotes is the room temperatures assumed. HG assumes 21C throughout and DW have used a variety of...

3 weeks ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

Posted by: @grahamf If you are considering phasing the project, then I would investigate the VAT implications. A heat pump installation is zero...

3 weeks ago
Reply
RE: Is it the house or the equipment?

Posted by: @springswood I'm working on passive ways of reducing indoor temperatures. Good quality black out blinds are very effective at reduc...

3 weeks ago
Reply
RE: Is it the house or the equipment?

@springswood We have two Daikin single split A2A systems, 3.5kW in the living room and 2.5kW in the main bedroom. This is in a 4-bed detached, 1970s...

3 weeks ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

Volumisers and Buffers My updated and approved (by my wife!) radiator plan has a total radiator volume of 128.8 litres plus roughly 15-18 litres for...

3 weeks ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

Post by: @bash How it worked for me is that when I had all radiators fully open, that appeared to be on part of a long run of 15mm pipework, at lea...

3 weeks ago
Reply
RE: Question regarding Boiler Upgrade Scheme eligibility for ASHP with gas boiler replacement and existing A2A

Posted by: @jamespa The regulations are here Regulation 9(2) b is the key one Thanks for the pointer to the regulations, in particular: 9(2)...

3 weeks ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

@bash @jamespa Thanks both for the practical advice. Just to check I'm understanding this right. The game plan would be as follows: Turn the fl...

3 weeks ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

@bash Thanks, its good to hear about your experience. My concern with the pipework is along very similar lines. There is no way of knowing the actua...

3 weeks ago
Reply
RE: Adventures in heat loss calculations

Posted by @jamespa It would be interesting at some point to develop a list and estimates for all of them. Below I've considered the impact of t...

3 weeks ago
Reply
RE: Adventures in heat loss calculations

Posted by: @jamespa At this point its probably worth pointing out, for future reference, that degree days are not exactly the same as an offset ave...

4 weeks ago
Page 4 / 9
Share:

SPONSORS

Join Us!

Installer Finder

Degrees of Separation

Latest Posts

SPONSORS

Members Online

 No online members at the moment

Click to access the login or register cheese
Protected By
Shield Security PRO