Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!
that makes sense but it's a difficult balance between being cheap when the wind blows and expensive when it doesn't. It's not a good look for any government when relatively wealthy people with heat pumps, batteries and EVs can get even wealthier while those without struggle. I don't know what the answer is though, other than "storage" but that's easier said than done.
@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
Posted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄
Posted by: @derek-mPosted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄
This is very much a chicken and egg scenario, which comes first the energy or the storage? Plans in the pipeline 800mwh battery storage 2024 and new pump storage at Coire Glas, Loch Ness and Glenmuckloch. The issues are;
"They are not cheap to build - costs can run to £500m and more. They also take a long time to construct - between five to eight years.
Developers argue the current energy market does not have the mechanisms to make such major projects attractive to investors.
In addition, they cannot bid to sell electricity through the UK government's Contracts for Difference auction system, which offers 15-year long contracts." ( https://www.bbc.com/news/uk-scotland-highlands-islands-57510870)
The costs can be easily recovered from the wind farm £24.5 million costs to not produce. So maybe the government should subsidise building based on cost savings from wind generation. As mentioned previously the UK grid system is broken and this appears to be a feature of delayed storage solutions.
A private members bill has just been introduced into parliament.
@jeff I am glad now, that I took the 26p/kw fix price for a year, even if it seems crazy high after losing my 12p/kw price with Symbio.
16kw Samsung TDM ASHP. 8.4kw PV, power optimizers 20×420watt panels 6kw SolarEdge inverter.
Posted by: @andris@jeff I am glad now, that I took the 26p/kw fix price for a year, even if it seems crazy high after losing my 12p/kw price with Symbio.
Price cap going up from £1971 to £3238 for an average home a possibility?
https://www.bbc.co.uk/news/business-60506940
@Jeff, that is plain crazy. Wow. There are so many people that aren't going to be able to afford that.
🔥 Britain’s Heat Pump Shitshow
How Installing a Heating System Became a National Nervous Breakdown
Free UK shipping.
📗 Heat Pumps Explained
A Jargon-Free Guide for Homeowners
Rewritten and updated for 2027
📘 From Zero to Heat Pump Hero
🛠️ Bodge Buster
New to heat pumps?
Take the Heat Pump Fundamentals course and use INTRO50 at checkout for 50% off.
@Jeff, that's good news. It'll be interesting to see what happens over the summer, and whether October will lead to positive news when the tariff cap is revisited.
I'm still subscribed to the weekly local oil club newsletter and I see that kerosene went up again this week.
🔥 Britain’s Heat Pump Shitshow
How Installing a Heating System Became a National Nervous Breakdown
Free UK shipping.
📗 Heat Pumps Explained
A Jargon-Free Guide for Homeowners
Rewritten and updated for 2027
📘 From Zero to Heat Pump Hero
🛠️ Bodge Buster
New to heat pumps?
Take the Heat Pump Fundamentals course and use INTRO50 at checkout for 50% off.
- 27 Forums
- 2,783 Topics
- 65.6 K Posts
- 2,154 Online
- 7,187 Members
Join Us!
Installer Finder
Degrees of Separation
Latest Posts
-
RE: DIY Heat Pump Installations: Navigating Legal and Regulatory Hurdles
Without doing some research I can't immediately answer ...
By JamesPa , 28 minutes ago
-
RE: How should the Boiler Upgrade Scheme be reformed?
Political suicide given that the vast majority depend o...
By JamesPa , 1 hour ago
-
RE: Replacing Storage Heaters with a Heat Pump in a Stone Cottage
Excellent find, thanks for posting the link here.
By cathodeRay , 6 hours ago
-
RE: Tesla Powerwall (2) Calibration Cycles
For Powerwall calibration, avoid forcing repeated deep ...
By EnergyStorageTech , 7 hours ago
-
Over the years, due to the non barrier PEX underfloor h...
By bobflux , 19 hours ago
-
RE: Getting closer to a finished Haier system
All the 45° elbows required for getting the primaries i...
By Singlespeed , 20 hours ago
-
RE: battery storage without solar
Indeed, current on the grid input = current used for ch...
By bobflux , 2 days ago
-
RE: Who's your electricity provider and what's your tariff?
@papahuhu @papahuhu A lot of tears and sweat went into ...
By Andris , 2 days ago
-
RE: Solar Power Output – Let’s Compare Generation Figures
We have the same problem, 12 mature trees clip the morn...
By Papahuhu , 3 days ago
-
RE: Solis inverters S6-EH1P: pros and cons and battery options
I had a battery and inverter installed a while ago, my ...
By Batpred , 3 days ago
-
RE: Is This Initial Free Quote From Octopus Trusted Partner Reasonable?
@ltron2 The EPC on our house is A-92, however that i...
By Rob of York , 3 days ago
-
RE: Heat pump branding. Clever, contemporary… or a bit too much?
The layout is confusing - much better like this: We b...
By downfield , 4 days ago
-
RE: Is it just me, or does tradesperson timekeeping and communication drive you absolutely mad?
My experience, backed up by opinions from various frien...
By Majordennisbloodnok , 4 days ago
-
RE: Analysis of the economics of switching to an A2W ASHP compared to other heat sources
I had a meeting today with a company based out of Swede...
By Mars , 5 days ago
-
RE: Review your electricity provider
We were with Octopus in our old house and it was fault...
By ian33a , 5 days ago