that makes sense but it's a difficult balance between being cheap when the wind blows and expensive when it doesn't. It's not a good look for any government when relatively wealthy people with heat pumps, batteries and EVs can get even wealthier while those without struggle. I don't know what the answer is though, other than "storage" but that's easier said than done.Â
@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
Posted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄Â
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄Â
Posted by: @derek-mPosted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄Â
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄Â
This is very much a chicken and egg scenario, which comes first the energy or the storage? Plans in the pipeline 800mwh battery storage 2024 and new pump storage at Coire Glas, Loch Ness and Glenmuckloch. The issues are;
"They are not cheap to build - costs can run to £500m and more. They also take a long time to construct - between five to eight years.
Developers argue the current energy market does not have the mechanisms to make such major projects attractive to investors.
In addition, they cannot bid to sell electricity through the UK government's Contracts for Difference auction system, which offers 15-year long contracts." ( https://www.bbc.com/news/uk-scotland-highlands-islands-57510870) Â
The costs can be easily recovered from the wind farm £24.5 million costs to not produce. So maybe the government should subsidise building based on cost savings from wind generation. As mentioned previously the UK grid system is broken and this appears to be a feature of delayed storage solutions.
A private members bill has just been introduced into parliament.Â
Â
@jeff I am glad now, that I took the 26p/kw fix price for a year, even if it seems crazy high after losing my 12p/kw price with Symbio.
16kw Samsung TDM ASHP. 8.4kw PV, power optimizers 20×420watt panels 6kw SolarEdge inverter.
Posted by: @andris@jeff I am glad now, that I took the 26p/kw fix price for a year, even if it seems crazy high after losing my 12p/kw price with Symbio.
Price cap going up from £1971 to £3238 for an average home a possibility?
https://www.bbc.co.uk/news/business-60506940
@Jeff, that is plain crazy. Wow. There are so many people that aren't going to be able to afford that.
Get a copy of The Ultimate Guide to Heat Pumps
Subscribe and follow our YouTube channel!
@Jeff, that's good news. It'll be interesting to see what happens over the summer, and whether October will lead to positive news when the tariff cap is revisited.
I'm still subscribed to the weekly local oil club newsletter and I see that kerosene went up again this week.Â
Get a copy of The Ultimate Guide to Heat Pumps
Subscribe and follow our YouTube channel!
Currently viewing this topic 4 guests.
Recently viewed by users: Transparent 28 seconds ago.
- 26 Forums
- 2,342 Topics
- 53 K Posts
- 260 Online
- 6,000 Members
Join Us!
Worth Watching
Latest Posts
-
RE: Octopus Cosy Heat Pump Owners & Discussion Thread
@agentgeorge unfortunately mine is a structure borne no...
By swwils , 3 minutes ago
-
RE: Controlling Daikin Altherma via P1P2 and Home Assistant
So to clarify (and rephrase the problem into my own ter...
By Majordennisbloodnok , 43 minutes ago
-
RE: Free Ecoheat Heat Pump Install
This is an interesting way of looking at it, and I can ...
By Mars , 1 hour ago
-
RE: Configuring third party dongle for Ecodan local control
That's a good spot and a valuable insight, @sheriff-fat...
By Majordennisbloodnok , 1 hour ago
-
RE: Are We Sleepwalking Into Another Race to the Bottom?
@majordennisbloodnok And did ‘Honey’ order it for you? ...
By Toodles , 2 hours ago
-
RE: Setback savings - fact or fiction?
@robs — thanks again for your detailed comments. Some r...
By cathodeRay , 15 hours ago
-
RE: A Smarter Smart Controller from Homely?
@papahuhu I hope you get a swift resolution. Regards, T...
By Toodles , 19 hours ago
-
RE: Poll for Time of Use, tariffs, technology
That’s fine by me too Major, I feel it is a sad reflect...
By Toodles , 20 hours ago
-
Bingo. Sometimes a judiciously placed size 10 bovver bo...
By Majordennisbloodnok , 21 hours ago
-
RE: Mitsubishi Ecodan 11.2kW heat pump with low COP
@ciocoiu-alexandru I can't provide the same level of di...
By Sheriff Fatman , 21 hours ago
-
The three technical issues I'm considering are: BMS...
By Transparent , 23 hours ago
-
RE: LiFePO4 lithium battery fires and explosions
@transparent Your post may fit better in th...
By Batpred , 24 hours ago
-
RE: British Gas vs Octopus Energy vs Heat Geek vs EDF vs Aira vs OVO vs EON.Next vs Boxt
@jamespawhite, if you could be bothered, you could also...
By Mars , 1 day ago
-
RE: Commencing on an ASHP Installation Process
I've got a bit of time to draft something today, so the...
By Sheriff Fatman , 2 days ago
-
RE: Help with heat pump sizing
@amin I dont think materially relative to t...
By JamesPa , 2 days ago
-
@majordennisbloodnok I have decided to take the plunge....
By TechnoGeek , 2 days ago
-
RE: Different dT on each radiator?
I cant sorry. Its based on some calculations I did fro...
By JamesPa , 3 days ago
-
RE: Help me keep the faith with my air source heat pump installation
@simonf thats interesting as I’ve noticed my flow and r...
By AdamK , 3 days ago