Planning permission...
 
Notifications
Clear all

Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!

Planning permission query - are the 14kw ecodan's a permitted development??

6 Posts
3 Users
0 Reactions
2,573 Views
 RV3
(@rv3)
Trusted Member Member
Joined: 5 years ago
Posts: 40
Topic starter   [#103]

Hello all - we're about three weeks away from an installation of an ecodan 14kw. I'd thought that this was covered as a permitted development - this is what the installer advised - also seemed to be backed up by my research.

However - if you fast forward to the 5min 30second mark of this video the guy installer here who seems very well up on things says that the 14kw ecodans are not covered - only the smaller ones in the range.

I've queried this with the installer and will attempt some further research.

Pls can anyone advise? I know a couple of the contributors on here (George and Kev?) have the ecodan 14kw's - did you need to get planning?

Very grateful for any help on this. Sorry - I know planning has been discussed on here before and can vary locally in practice - just trying to check the position as def don't want hassles further down the line etc.

 

Many thanks.

 

 

 

 

 

 



   
Quote
(@batalto)
Noble Member Member
Joined: 5 years ago
Posts: 1092
 

I believe the planning permission applies to the sound from the unit

Planning permission, rules for air source heat pumps:As part of Permitted Development Rights planning permission will no longer be required as long as a few rules are adhered too.
 
Only one heat pump can be installed without planning permission if you have 2 units you ALWAYS need planning permission.

The outdoor unit must be less than 0.6m^3 in size It must not exceed 45dBa as measured at the nearest window of the next door neighbour’s property.

It must be installed by MCS installer as part of the MCS scheme.


12kW Midea ASHP - 8.4kw solar - 29kWh batteries
262m2 house in Hampshire
Current weather compensation: 47@-2 and 31@17
My current performance can be found - HERE
Heat pump calculator spreadsheet - HERE


   
ReplyQuote
 RV3
(@rv3)
Trusted Member Member
Joined: 5 years ago
Posts: 40
Topic starter  

@batalto thanks for this - will try to confirm dimensions.



   
ReplyQuote



 RV3
(@rv3)
Trusted Member Member
Joined: 5 years ago
Posts: 40
Topic starter  

Dimensions are 1020 x 330 x 1350 = 0.45m cubed so under the 0.6 quoted above which was the only thing that looked like it might be a problem from the above.

 

Thanks again @batalto

 

 



   
ReplyQuote
(@batalto)
Noble Member Member
Joined: 5 years ago
Posts: 1092
 

@rv3 when in doubt - double check with the local council planners


12kW Midea ASHP - 8.4kw solar - 29kWh batteries
262m2 house in Hampshire
Current weather compensation: 47@-2 and 31@17
My current performance can be found - HERE
Heat pump calculator spreadsheet - HERE


   
ReplyQuote
(@kev-m)
Noble Member Member
Joined: 5 years ago
Posts: 1276
 

@rv3, I didn't need planning permission for my 14kW Ecodan. As you say, it comes under the 0.6 m3 limit so is permitted development. 



   
ReplyQuote





Share:

Join Us!

Latest Posts

Click to access the login or register cheese
x  Powerful Protection for WordPress, from Shield Security PRO
This Site Is Protected By
Shield Security PRO