Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!
An abject and utter failure...
I have been meaning for a while to see what data has been published about Green Home Grant applications and installations, for both the Voucher scheme and the LAD schemes. These schemes, it must be remembered, are THE main way the government intend to get us Luddites to take up low carbon energy. If they fail, the whole thing fails.
Background: in late 2020, the government announced plans to install 600,000 heat pumps in the UK every year until 2028... 600,000 x 8 = 4.8m
Rather amazingly, the data is available. Here are the headline figures for England for all GHG ASHP installations:
GHG Voucher Scheme: 3,968 (to 7th(?) Feb 2022)
LAD Phase 1: 773 (to end Feb 2022)
LAD Phase 2: 116 (to end Feb 2022) (and I am presumably one of those 116 installations...)
There are around 25,000,000 dwelling in England. You can do the maths as well as I can...
Sources:
GHG Voucher scheme (Table 2.1)
LAD scheme (Tables 1.1 and 1.2)
Midea 14kW (for now...) ASHP heating both building and DHW
Posted by: @cathoderayI have been meaning for a while to see what data has been published about Green Home Grant applications and installations, for both the Voucher scheme and the LAD schemes. These schemes, it must be remembered, are THE main way the government intend to get us Luddites to take up low carbon energy. If they fail, the whole thing fails.
Background: in late 2020, the government announced plans to install 600,000 heat pumps in the UK every year until 2028... 600,000 x 8 = 4.8m
Rather amazingly, the data is available. Here are the headline figures for England for all GHG ASHP installations:
GHG Voucher Scheme: 3,968 (to 7th(?) Feb 2022)
LAD Phase 1: 773 (to end Feb 2022)
LAD Phase 2: 116 (to end Feb 2022) (and I am presumably one of those 116 installations...)
There are around 25,000,000 dwelling in England. You can do the maths as well as I can...
Sources:
GHG Voucher scheme (Table 2.1)
LAD scheme (Tables 1.1 and 1.2)
I'm afraid that you need to understand that when someone obtains a job at BEIS or MCS, the first requirement before they are allowed to start work is that they have to have a lobotomy, so that they are completely devoid of common sense.
Posted by: @hamish-mcmichaelcan you post the link to the data please?
The links are there, I posted them with the original post, but for some reason they don't stand out as links. Hover over the left hand end of each of the three lines under 'Sources', and you should see them change, the cursor changes to a finger/pointer and the linked to site appears at the bottom of the screen. They work as links for me when I click them. The first two are xlsx data files, the third is a pdf.
@editor - maybe CSS not behaving as it should on the links?
Posted by: @derek-mthe first requirement before they are allowed to start work is that they have to have a lobotomy, so that they are completely devoid of common sense
Which leaves the rest of us feeling like we need lobotomies, to avoid feeling pain of living in a mad world. I suspect MCS are are major factor in why the UK ASHP industry is in the state it is.
Midea 14kW (for now...) ASHP heating both building and DHW
"For the rejected applications, 49 per cent were rejected as the application was deemed ineligible."
I'm sorry, what?
Off grid on the isle of purbeck
2.4kW solar, 15kWh Seplos Mason, Outback power systems 3kW inverter/charger, solid fuel heating with air/air for shoulder months, 10 acres of heathland/woods.
My wife’s house: 1946 3 bed end of terrace in Somerset, ASHP with rads + UFH, triple glazed, retrofit IWI in troublesome rooms, small rear extension.
Posted by: @hughf"For the rejected applications, 49 per cent were rejected as the application was deemed ineligible."
I'm sorry, what?
I should wait till after coffee before trying to digest that spreadsheet - I thought that was 'illegible', hence my utter confusion 🙂
Off grid on the isle of purbeck
2.4kW solar, 15kWh Seplos Mason, Outback power systems 3kW inverter/charger, solid fuel heating with air/air for shoulder months, 10 acres of heathland/woods.
My wife’s house: 1946 3 bed end of terrace in Somerset, ASHP with rads + UFH, triple glazed, retrofit IWI in troublesome rooms, small rear extension.
@hughf - the whole thing is eye-watering. The minute numbers of actual installs is only the headline...
Midea 14kW (for now...) ASHP heating both building and DHW
- 27 Forums
- 2,811 Topics
- 66.5 K Posts
- 2,599 Online
- 7,217 Members
Join Us!
Installer Finder
Degrees of Separation
Latest Posts
-
RE: Why don't people choose heat pumps?
It's swings and roundabouts - during off-peak periods t...
By Temperature_Gradient , 35 minutes ago
-
RE: The Changing Jet Stream Could Challenge UK Air Source Heat Pumps
... And that's being generous! I'll tell you a littl...
By SusannaSaunders , 7 hours ago
-
RE: Adding data centre electricity costs to domestic energy bills?
never ceases to amaze me.. Keeping steel works going ...
By Batpred , 8 hours ago
-
RE: Electricity price predictions
great session Reminds me why some politicians can be ha...
By Batpred , 8 hours ago
-
RE: Boiler Upgrade Scheme funding reduced by circa £750 million in 2026 budget
Absolutely agree. The massive Hager CU my vaillant requ...
By Batpred , 8 hours ago
-
RE: How much of your renewable and home setup would still work if the internet went down?
absolutely agree. even if many providers see that extra...
By Batpred , 8 hours ago
-
RE: Octopussy cosy 6 experience
People who have a Cosy appear generally to be happy wit...
By JamesPa , 12 hours ago
-
I thought the cr*p came first and the biofuel came afte...
By Majordennisbloodnok , 16 hours ago
-
RE: Aerotherm and weather compensation
@jamespa I replied yesterday with detailed readings whi...
By DavidB , 2 days ago
-
RE: Marvel Heating liquidation
@editor This is an important point. each winter, you...
By davidnolan22 , 3 days ago
-
RE: Solar Power Output – Let’s Compare Generation Figures
Very nice. we’ve been super soggy here, but rather m...
By Papahuhu , 4 days ago
-
RE: DIY powerflushing tutorial
Interesting! I toyed with the idea too. But I installed...
By bobflux , 4 days ago
-
RE: 15kw pump for 225m2 1990's house - over kill?
@seaviews Agree with the others on sequence: loft first...
By mk1234 , 4 days ago
-
RE: Vaillant ecoTEC Plus - Flow Temp and Set Up
Heating been on for 4 weeks now, continuous. It's 6C o...
By trebor12345 , 5 days ago