Search with Wattson
Activity
 
Notifications
Clear all

Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!

Rob of York
@rob-of-york
Member
Estimable Member
Joined: Aug 25, 2026
Last seen: Oct 26, 2026
Topics: 8 / Replies: 119
Reply
RE: Question regarding Boiler Upgrade Scheme eligibility for ASHP with gas boiler replacement and existing A2A

Thanks @jamespa The gas fire is definitely not an essential part of the heating system, since the gas central heating manages to cover the full heat...

1 month ago
Reply
RE: Question regarding Boiler Upgrade Scheme eligibility for ASHP with gas boiler replacement and existing A2A

We currently have a gas boiler used for central heating and hot water, two A2A units capable of heating and cooling, and a separate gas fire in the li...

1 month ago
Reply
RE: Starting Our Heat Pump Journey: 1962 build 3 bed detached house

@ian-s I would encourage you to have a conversation with HG at this stage rather than stop at this point. You might still call a halt later, but yo...

1 month ago
Reply
RE: Is it the house or the equipment?

@springswood Gas connection / disconnection is the responsibility of your energy provider i.e. Octopus, so you could ask them. I know they do discon...

1 month ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

Posted by: @grahamf if you are planning to install a flow meter, I would suggest considering a heat meter instead Thanks for the link to the mo...

1 month ago
Reply
RE: Starting Our Heat Pump Journey: 1962 build 3 bed detached house

@ian-s One interesting difference between your two quotes is the room temperatures assumed. HG assumes 21C throughout and DW have used a variety of...

1 month ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

Posted by: @grahamf If you are considering phasing the project, then I would investigate the VAT implications. A heat pump installation is zero...

1 month ago
Reply
RE: Is it the house or the equipment?

Posted by: @springswood I'm working on passive ways of reducing indoor temperatures. Good quality black out blinds are very effective at reduc...

1 month ago
Reply
RE: Is it the house or the equipment?

@springswood We have two Daikin single split A2A systems, 3.5kW in the living room and 2.5kW in the main bedroom. This is in a 4-bed detached, 1970s...

1 month ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

Volumisers and Buffers My updated and approved (by my wife!) radiator plan has a total radiator volume of 128.8 litres plus roughly 15-18 litres for...

1 month ago
Reply
RE: Next steps on my ASHP journey: Radiators and Pipework

Post by: @bash How it worked for me is that when I had all radiators fully open, that appeared to be on part of a long run of 15mm pipework, at lea...

1 month ago
Reply
RE: Question regarding Boiler Upgrade Scheme eligibility for ASHP with gas boiler replacement and existing A2A

Posted by: @jamespa The regulations are here Regulation 9(2) b is the key one Thanks for the pointer to the regulations, in particular: 9(2)...

1 month ago
Page 6 / 11
Share:

SPONSORS

Join Us!

Installer Finder

Degrees of Separation

Latest Posts

SPONSORS

Click to access the login or register cheese
Protected By
Shield Security PRO