Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!
Ecodan install
Hi all.
Electricity amp upgraded today from 60a to 100a in readiness for ASHP install. Arranged through the DNO. Took the guys maybe 25min. Cost was £342.78 paid upfront. Apparently this used to be free. Oooof.
Install begins on Monday all being well. Will keep updating, hopefully it'll be therapeutic for me but also the stuff shared on here has just been so helpful sort of keen to try and contribute any learning for others in same boat as me..
@RV3 looking forward to your updates. I have an Ecodan install scheduled in October.
Retrofitted 11.2kw Mitsubishi Ecodan to new radiators commissioned November 2021.
14 x 500w Monocrystalline solar panels.
2 ESS Smile G3 10.1 batteries.
ESS Smile G3 5kw inverter.
Hello all. Install completed. Hot water again!! Pretty smooth install I think, two blokes here for five days, also couple of electricians for a day and a half. Our old system took some work to figure out I think. Hopefully the solar thermal on the roof brought back into operation as well it wasn't working. Very early days so will report back as start to get used to it.
In the meantime - just as I go live with ASHP my elec supplier goes bust - and my 14p per kwh deal is I would imagine a thing of the past.
@rv3 what size KW is the Ecodan?
Retrofitted 11.2kw Mitsubishi Ecodan to new radiators commissioned November 2021.
14 x 500w Monocrystalline solar panels.
2 ESS Smile G3 10.1 batteries.
ESS Smile G3 5kw inverter.
@morgan, it's the 14kw. You'll see on the ecodan website most of the other smaller sizes in the range seem to have had a makeover they look better and are marketed as 'ultra quiet'. Bit of a shame they hadn't done this with the 14kw as well - they'll maybe release one sooner or later but we needed to crack on.
When is your install scheduled for, might be good to compare learner notes - the received wisdom seems to be there's a period of adjustment and tinkering before you can settle on the optimum etc.
@rv3 21/22 October for the water followed by the CH on 28/29 October. Installers need to split the job due to being very busy.
Retrofitted 11.2kw Mitsubishi Ecodan to new radiators commissioned November 2021.
14 x 500w Monocrystalline solar panels.
2 ESS Smile G3 10.1 batteries.
ESS Smile G3 5kw inverter.
Just had a call from my installer bringing my install forward (post above) to commence Monday 11th October to be completed by Friday in one go. Happy days 👍
Retrofitted 11.2kw Mitsubishi Ecodan to new radiators commissioned November 2021.
14 x 500w Monocrystalline solar panels.
2 ESS Smile G3 10.1 batteries.
ESS Smile G3 5kw inverter.
- 27 Forums
- 2,792 Topics
- 66 K Posts
- 2,706 Online
- 7,197 Members
Join Us!
Installer Finder
Degrees of Separation
Latest Posts
-
RE: Heat pump branding. Clever, contemporary… or a bit too much?
I think Heat Geek have done an amazing job on their bra...
By Tomtheheatingengineer , 10 hours ago
-
RE: HeatGeek vs Octopus surveys: puzzling disparity - any ideas why?
I have just had 3 heat loss surveys, one by heat geek o...
By David , 10 hours ago
-
RE: Heat Geek Zero Disrupt: Are We Sleepwalking Into Another Race to the Bottom?
I think that's the key question. After all inverter uni...
By Prunus , 12 hours ago
-
RE: battery storage without solar
As of October 1st they need specific qualifications to ...
By EtchedPixels , 12 hours ago
-
RE: How should the Boiler Upgrade Scheme be reformed?
A unit which uses water to transfer the heat/chill from...
By Temperature_Gradient , 13 hours ago
-
RE: Renewables & Heat Pumps in the News
With regards to the BUS grant raid, I gave it more thou...
By ASHP-BOBBA , 13 hours ago
-
RE: Why are ASHP installs so expensive?
The whole system seems to work on the basis of...
By ian33a , 14 hours ago
-
RE: Missing flow temperature in Heat Geek proposal
Good plan. If you can get half hourly meter readings a...
By JamesPa , 19 hours ago
-
RE: Heat Pumps Without Grants: Would You Have Installed One & Will You Now?
@editor Most certainly. The heat pump was an ideal s...
By Abernyte , 19 hours ago
-
Although regulations may well vary from country to coun...
By Majordennisbloodnok , 19 hours ago
-
RE: Does anyone have experience of a smart water meter?
Yep I caught our slow leak from a £100 bill rise 8)
By EtchedPixels , 19 hours ago
-
RE: Do You Need a Buffer Tank or Low Loss Header for Underfloor Heating in a Large Property?
@jamespa in some cases, failing the Turing test might b...
By GrahamF , 23 hours ago
-
RE: Passiv Smart Thermostat - Help & Forum Support
@energystoragetech The heat capacity of some...
By JamesPa , 1 day ago
-
RE: tepeo ZEB UK Support & Info Thread
Sorry you are correct, I was remembering figures from t...
By JamesPa , 1 day ago