Opinions please on me putting a 2.5kW roof mounted turbine on my garage - am I mad?
Hi folks. I have ASHP, Solar PV (5.46kW) and a 10kW battery set up. I’m thinking of putting a 2.5kW roof mounted turbine on my garage.
the garage houses the PV, Battery and Inverter already.
wind speed per second for my location is an average of 6.
my thinking is that it would be beneficial for an outlay of circa £3k because although 2.5kW isn’t huge it at least still produces at night and certainly through the winter months.
I’m thinking this could significantly offset the cost of running the ASHP and would make its money back in about 6 years.
I would put it on the back end of here.
Am I deluded?
I don’t think you’re mad. If you can afford it, and you have a property where you can add a wind turbine, that alone usually trumps an immediate RoI. I’d like to know more about the turbine you’re thinking of putting in.
@transparent knows a thing or two about turbines.
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
@editor I’m researching models at the moment Mars, it’s not easy or obvious so far.
in terms of the cost, ScotGov offer a £2500 interest free loan, but no grants at the moment.
im thinking for £20 per month over 10 years it merits serious consideration. The price of a mobile sim contract really.
I don't know about the rules in Scotland, but I think that planning permission would be required since you also have a heat pump.
Posted by: @marvinator80I’m researching models at the moment Mars, it’s not easy or obvious so far.
Yeah, I know. It’s not a massive market so really interested to see what you discover.
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
@derek-m I’ve seen that quoted but I think it might be a widely circulated error. Will check with planning though if I can find a model to move forward with.
Posted by: @marvinator80I’ve seen that quoted but I think it might be a widely circulated error.
If you check permitted development rules for Scotland you can ASHP x1 and a Micro Wind Turbine on a site without planning.
6.21 This provides potential opportunities for one MWT and one ASHP within the same curtilage, but not more than one of each using permitted development rights. For example, this would allow for a wind turbine to provide the electricity to power a heat pump.
When looking at turbines make sure you take in to account
Different outputs at different wind speeds not just the average.
Building effect on output - which be very dramatic unless many metres above the building, due to turbulence
Posted by: @AnonymousPosted by: @marvinator80I’ve seen that quoted but I think it might be a widely circulated error.
If you check permitted development rules for Scotland you can ASHP x1 or Wind Turbine on a site without planning. If you want both it is no longer permitted development.
When looking at turbines make sure you take in to account
Different outputs at different wind speeds not just the average.
Building effect on output - which be very dramatic unless many metres above the building, due to turbulence
yeah, I will definitely talk to planning if I can find a viable system.
why do you think they restrict it in that way. How does having a ASHP make them require planning for a small roof mounted turbine?
Interesting notion @marvinator80
In case you were wondering, here's how I would apply a mechanical lever to the wall of your garage in order to shake the bricks apart:
Better still, I could achieve the damage much faster if I used a varying force at the top of the pole.
Instead of it always being applied in the same direction, I would vibrate it randomly around the horizontal plane.
At some point in time it might even achieve resonance with the length of the pole above the upper bracket, which would amplify my efforts.
The foregoing explanation is based on a true story...
... which happened so often that the major UK company who developed 1kW wall-mounted wind-turbine lost their sales deal with B&Q.
Alternatively you could use a ground-mount tower.
Here's one I built using a triangular aluminium lighting truss which was being offered by the liquidator of a night-club that had closed down.
The horizontal pole close to the bottom is called the jack-stay.
You attach a rope to that in order to raise and lower the tower around the bearings at the base.
Some people then remove the jack-stay.
I decided to leave mine in place, which adds to the rigidity of the mechanism.
Save energy... recycle electrons!
- 26 Forums
- 2,152 Topics
- 47.2 K Posts
- 102 Online
- 5,671 Members
Join Us!
Podcast Picks
Latest Posts
-
RE: A Customer's Lessons Learnt from a Heat Pump Installation in a Large House
@jamespa Others work such that you can only program set...
By Lucia , 5 minutes ago
-
RE: Solar Power Output – Let’s Compare Generation Figures
1040kw Even beat June and July. Great month.
By Andris , 20 minutes ago
-
RE: Midea ASHP – how to set weather compensation
I'm guessing these are the mcs defaults which are likel...
By JamesPa , 34 minutes ago
-
RE: New Vaillant aroTherm Plus in black - When will it come to the UK?
Hope they know what they're doing regarding paint types...
By PatrickVito , 54 minutes ago
-
RE: What crazy nonsense are inverter limits and why are they imposed?
I’ve also got a dual fuel Rangemaster. We originally ha...
By Majordennisbloodnok , 3 hours ago
-
RE: Octopus tariffs - a quick comparison
@tim441 I’d agree wholeheartedly with that, with 2 x Po...
By Toodles , 5 hours ago
-
RE: Electricity price predictions
@bontwoody Maybe one for @editor to consider whether a ...
By ChandyKris , 10 hours ago
-
RE: is a home battery without an EV worth it?
You would think, but when I had my Powerwall 3 installe...
By Old_Scientist , 11 hours ago
-
@mars That response surely deserves a nomination for Tu...
By JamesPa , 23 hours ago
-
Specifying batteries, pv solar etc using ChatGPT
I thought I'd try to use ChatGPT to specify my requirem...
By Tim441 , 1 day ago
-
RE: Ecodan & MelCloud scheduling
When I interviewed Mitsubishi Electric at Installer ear...
By Mars , 1 day ago
-
RE: Rodents! A word of warning for heat pump owners
@lucia One look at that protection and the rodents will...
By Toodles , 1 day ago
-
What is the Heat Geek Guarantee?
We regularly hear from homeowners who are researching i...
By Mars , 2 days ago
-
RE: Help me keep the faith with my air source heat pump installation
@adamk, interesting point. I’ve not focused much on Hea...
By Mars , 2 days ago
-
Intelligent Octopus Flux (IOF) Review
I promised @toodles that I would provide an update and ...
By Old_Scientist , 2 days ago
-
RE: Who's your electricity provider and what's your tariff?
I am pleased to see the change. We definitely need t...
By Jeff , 3 days ago
-
RE: How Do I Know When the Hot Water Has Run Out?
@transparent that is a very interesting suggestion, tha...
By GrahamF , 4 days ago
-
RE: The good, the bad and the not that great – my heat pump installation
Sorry to resurrect this thread, but it is sort of relev...
By cathodeRay , 4 days ago
-
RE: Getting the best out of a heat pump - is Homely a possible answer?
I missed your 22nd June post on this. I am sure it can ...
By cathodeRay , 4 days ago