National Grid consultation on upgrading etc
Posted by: @transparentSince the Energy Bill hasn't yet passed through Parliament, there is bound to be a lot of uncertainty.
https://www.gov.uk/government/collections/energy-security-bill -> https://www.parliament.uk/business/news/2022/july-2022/lords-considers-energy-bill/ -> https://bills.parliament.uk/bills/3311 given royal assent on 26 October 2023. Part 5 https://www.legislation.gov.uk/ukpga/2023/52/part/5/enacted is about the ISOP.
mea culpa.
I have some homework to catch up on.
Save energy... recycle electrons!
This post is copied across from the Welcome topic because it's more relevant here.
Are you suggesting to National Grid that they should be targeting upgrading their local distribution infrastructure (at the expense of their National infrastructure, presumably). It is local connections that seem to be the problem both for generators and consumers.
This depends on where you are in the country.
As we move towards an energy supply system which has thousands of generation sites spread across the regions, I believe that the grid topology should reflect this.
The National Grid Transmission network runs at 400kV (and a few sections at 275kV) but was designed around a few major power plants which existed in the 1930s. It's rather like a tree which picks up nutrients from relatively few main roots (routes!) and transports them to the leaves via a trunk.
Now in 2024 we have generation from vastly more sites, most of which are not far from the leaves.
The historical approach by National Grid Electricity Transmission (NGET) to increase capacity has been to build a thicker trunk.
I contend that strategy is
- too expensive (more than HS2)
- ineffective
If we consider the future grid as an organic structure, then its topology should develop in similar fashion to a biological model.
Generation and Demand sites are interlinked by a number of different pathways.
That organic grid is not only much cheaper, but also far more resilient to failure and malicious attack.
Save energy... recycle electrons!
Neither National Grid Electricity Transmission (NGET) nor the regional DNOs are permitted to own or control any form of storage or generation.
Storing electricity lowers the need for greater grid capacity.
Less power must be carried during times of peak demand because it's already being held where it's needed.
So if we want to avoid paying higher bills for massive grid upgrades, then NGET need to see us implementing storage.
Save energy... recycle electrons!
@transparent So a distributed multi-path arrangement similar to communications networks? This would be sensible from a robustness (and security!) standpoint, too.
For domestic customers, I imagine the problem is co-ordinating or managing supply and demand at the local, neighbourhood level. Some thought has been given to this in the past and I believe that hooks are included in smart meter protocols to facilitate load management. There could be problems making use of these given a widespread public belief that they could be used to remotely terminate supplies.
Posted by: @transparentNGET need to see us implementing storage.
Vehicle-to-grid or vehicle-to-load as mandatory for new EVs and chargers? 🙂 At the very least the more wealthy (those with EVs and their own charging point) should have to lead the storage rollout!
Yes @chickenbig - Vehicle to Grid (or Vehicle to Home) is the sort of 'consumer driven' approach which needs to be evident.
But let's look at the current situation:
- Only EVs with CHAdeMO connectors, like the Nissan Leaf, can readily be used with V2G chargers.
- The more common CSS connector needs a new design specification to be able to export energy from the car.
- The V2G Trial run by OVO/Kaluza successfully implemented about 440 V2G sites before the money ran out.
- The final report on that Sciurus Trial by Cenex was brief and positive, but took none of the energy losses into account.
- EVs use LithiumMNC batteries, which suffer greater degradation per charge-cycle than do batteries with other lithium chemistries
It's a lot cheaper to build static storage batteries for incorporation into the home.
The Achilles heel is the high profit margins and high costs of installation for domestic storage.
Save energy... recycle electrons!
- 26 Forums
- 2,113 Topics
- 46.4 K Posts
- 57 Online
- 3,410 Members
Join Us!
Latest Posts
-
@seatonian got your email. Will connect you with a reco...
By Mars , 10 hours ago
-
-
RE: Buffers, hot water and cooling
Some fair points... I've been doing some investigations...
By Prunus , 11 hours ago
-
RE: Wood burner with ASHP - direct air?
I love the new fully Viking look... best personal avata...
By Mars , 21 hours ago
-
RE: No-code, plug-and-play monitoring for your heat pump
I think I have found “The One!” Waveshare ESP32-S3-POE-...
By Grantmethestrength , 1 day ago
-
@downfield and @toddles, this isn’t in the settings cur...
By Mars , 2 days ago
-
RE: Homely launched for Grant Aerona ASHP control
I haven't bought the Aerona Smart Controller (£700!) bu...
By Prunus , 3 days ago
-
RE: Antifreeze top up for my heat pump - is this a rip off?
For the record, Grant supply ethylene glycol for their ...
By Prunus , 3 days ago
-
RE: Compressor attempts start but fails - Nibe Fighter 2005 8kW
@skyefarmer amazing. Well done!
By Mars , 3 days ago
-
RE: Air source heat pump roll call – what heat pump brand and model do you have?
Ebac 5kw - Monobloc R32. Developed and made in UK - Mit...
By marcinwloch69@gmail.com , 5 days ago
-
RE: Is a Valliant Inline 6kW heater a BUS buster?
Just another thought - it might be worth thinking about...
By JamesPa , 5 days ago
-
RE: BUS Grant: removal of all other fossil fuel heat sources
@rikiarn - just have a think as to how much it will cos...
By Transparent , 5 days ago
-
Don't do much digging around.That's best left to the pr...
By Transparent , 5 days ago
-
Hi all, I was wondering if anyone had an idea of how th...
By Wh0am3ye , 6 days ago
-
RE: EBAC re-entering the ASHP market in 2023
@toodles confirm i have Ebac 5kw ASAP + homely and it w...
By marcinwloch69@gmail.com , 6 days ago
-
RE: Compute heat loss from energy used
@jamespa Ebac must be similar to Mitsubishi as they buy...
By marcinwloch69@gmail.com , 6 days ago
-
@pie_eater I have been thinking of adding cooling to my...
By TechnoGeek , 1 week ago
-
RE: Victorian Semi Retrofit / Extension ASHP and UFH Advice
Agree, but you may have a hard time convincing them, as...
By JamesPa , 1 week ago
-
RE: Seal the Deal: Don't Let Your Heat Pump Leak Energy
Hi - fyi - there's a dead image link in the 'Optimal In...
By seatonian , 1 week ago
-
RE: Ripped Off: How UK Homeowners Are Paying Gas Prices for Wind Energy
@chandykris Horses and beggars…. 😉 Toodles.
By Toodles , 1 week ago