Joining the Renewable Heating Hub forums is completely free and only takes a minute. By registering you’ll be able to ask questions, join discussions, follow topics you’re interested in, bookmark useful threads and receive notifications when someone replies. Non-registered members also do not have access to our AI features. When choosing your username, please note that it cannot be changed later, so we recommend avoiding brand or product names. Before registering, please take a moment to read the Forum Rules & Terms of Use so we can keep the community helpful, respectful and informative for everyone. Thanks for joining!
‘They’ve got the Power’
Here’s is an extract from a Chinese Publication headed: State-owned Assets Supervision and
Administration Commission of the State Council. (Normally, I would prefer to provide the url but my wife who studies Chinese culture and developments found the article and on her browser, it warned this was not necessarily a safe site so I am pasting the text below)
China's Largest Onshore Wind Power Base Starts Full Operation
The 3 million-kilowatt Hinggan League wind power project in North China's Inner Mongolia Autonomous Region developed by China General Nuclear Power Corporation (CGN) is in full operation, and is now the country's largest functioning onshore wind power base.
As one of the first large-scale wind-solar power bases built in the desert areas in China, the Hinggan League wind power project, with its 701 wind turbines, has an annual green power output of more than 10 billion kilowatt-hours, equaling that produced by burning 2.96 million metric tons of standard coal and eliminating carbon dioxide emissions of about 8.02 million tons.
According to CGN, the Hinggan League wind power project is the first new energy project that exports the 800-kV direct current ultra-high-pressure power in the country.
It is equipped with the first 1,000 megavolt-ampere/500-kV main transformer in the field of new energy, which effectively drives innovation of the upstream of the industrial chain.
What's more, the project is also the first of its kind to adopt the distribution phase modifier.
The Hinggan League wind power project was built in two phases.
The 1 million-kW wind power project of the first phase includes installation of 229 wind turbines and construction of a 500-kilovolt booster station and a 220-kV booster station. It was put into operation on June 29, 2022.
The second phase of the project includes installation of 472 wind turbines and construction of one 500-kV booster station and three 220-kV booster stations. It started full operation on Dec 10 this year.
The chairman of the board of CGN New Energy Holdings said that with operation of this wind power base, the installed capacity of CGN's new energy power generation facilities in operation in China is expected to reach 45 million kW by the end of 2023.
At present, CGN has more than 570 new energy projects in 30 provincial regions new covering wind power, photovoltaic power, solar power, pumped-storage, energy storage and hydrogen power.
Regards, Toodles.
Toodles, heats his home with cold draughts and cooks food with magnets.
- 26 Forums
- 2,699 Topics
- 63.3 K Posts
- 914 Online
- 7,107 Members
Join Us!
Installer Finder
Degrees of Separation
Latest Posts
-
RE: Electricity price predictions
Chinese manufacturing has the ability to be very good q...
By Majordennisbloodnok , 4 hours ago
-
RE: Air source heat pump roll call – what heat pump brand and model do you have?
Forum Handle: GotGordon Manufacturer: Samsun...
By Gotgordon , 15 hours ago
-
RE: Summer heat is becoming the new winter cold in the UK. What are you doing about it?
@ian33a I am not easy with sleep either unfortunately…....
By MK4 , 16 hours ago
-
RE: Renewables uptake near you
In a village of under 40 houses...Conservation Area. I'...
By Tim441 , 1 day ago
-
RE: Home Alone with Home Assistant (previously A Beginner's Guide to ASHP Monitoring)
Great news, @bontwoody.
By Majordennisbloodnok , 1 day ago
-
Haier R290 Super Aqua Monobloc. Output capacity tables.
As I mentioned in my introduction post, I've been consi...
By Singlespeed , 1 day ago
-
RE: Air to air bus grant installer anywhere
I am consistently told by aircon folks (ie air/air) tha...
By EtchedPixels , 2 days ago
-
RE: What is possible with FIT, SEG, Hate Pumps and Batteries?
Thank you, everyone, for your replies. Our FIT provid...
By ian33a , 2 days ago
-
@mk4 And of course, the panels are less productive due ...
By Toodles , 2 days ago
-
RE: GivEnergy inverter tripping due to over-voltage?
I'm trying to get clarity on exactly when the inverter ...
By Tim441 , 2 days ago
-
RE: Samsung Heat Pump – Can't Activate TW2 Pipe Sensor (for Delta T Control)
Autocorrupt seems to be working overtime.
By Majordennisbloodnok , 2 days ago
-
RE: Vehicle-to-Home with a Heat Pump: Is the Technology Ready and Which EV Should I Buy?
I looked into that wallbox a bit more off the back of t...
By Majordennisbloodnok , 3 days ago
-
RE: Say hello and introduce yourself
@jandp awesome system I hope it works out well.
By Judith , 3 days ago
-
RE: Surface mount or bury primaries for heat pump installation?
@bobflux That's the stuff. The installer recommended tw...
By tomasmcguinness , 5 days ago