Pipe Work Question?

6 Posts
4 Users
3 Likes
203 Views
(@ecobaker)
Trusted Member Member
190 kWhs
Joined: 2 months ago
Posts: 25
Topic starter  

I'm in that common situation where after having a heat pump installed and the performance isn't great, I've dived into youtube and forums like this only to realise that maybe my installer didn't design/install/set up the system particularly well.

I'm in a good situation that I still owe them over £600 for some of the work, which means I can hold that over them. The question I have is about the main pipe work for the flow and return from the HP unit. I have a 3.5m section in my loft that is plastic 22mm pipe, not copper like all the other pipe work. I understand that this will have reduced internal diameter and thus flow, maybe costing me efficiency. Should I hold back final payment and insist this is changed (along with a few other niggles I've found) or is it minor enough not to worry about?

(should add Samsung Gen6 8kw, on two bedroom victorian mid terrace)

This topic was modified 1 month ago by EcoBaker

   
Quote
(@bontwoody)
Prominent Member Contributor
2769 kWhs
Joined: 2 years ago
Posts: 394
 

I think the 22mm plastic pipe might be a bit small for 8kw. 22mm copper is considered ok for 5kW I think. This link gives more detail. https://www.heatgeek.com/does-my-pipework-need-upgrading-for-a-heat-pump-with-cheat-sheet/

House-2 bed partial stone bungalow, 5kW Samsung Gen 6 ASHP (Self install)
6.9 kWp of PV
5kWh DC coupled battery
Blog: https://thegreeningofrosecottage.weebly.com/
Heatpump Stats: http://heatpumpmonitor.org/system/view?id=60


   
EcoBaker reacted
ReplyQuote
Mars
 Mars
(@editor)
Illustrious Member Admin
16502 kWhs
Veteran
Joined: 3 years ago
Posts: 2297
 

The issue with the 22mm plastic piping in your loft could potentially impact the efficiency of your heat pump system, especially if it differs from the rest of your installation in terms of diameter. We have this issue where the previous owners “narrowed” the pipework when they extended the heating to the north end of the house, creating a bottleneck which I think is the major issue that the rads at the far end of the house struggle.

Did your installers run all the pipework for your system - copper and the 3.5m run in the loft?

Buy Bodge Buster – Homeowner Air Source Heat Pump Installation Guide: https://amzn.to/3NVndlU

Follow our sustainability journey at My Home Farm: https://myhomefarm.co.uk


   
EcoBaker reacted
ReplyQuote



(@ecobaker)
Trusted Member Member
190 kWhs
Joined: 2 months ago
Posts: 25
Topic starter  

@editor Yes so the pipe work from the HP that runs externally to the loft is copper, then the pipe work runs length of loft to the other end where the DHW tank is, that section inside the loft is plastic. I need to measure accurately to check diameters, but im fairly certain that it’s the same as the copper pipes. 

Thinking about it now, all l the pipe work externally from the HP is insulated, I’ve assumed it copper, but don’t know for sure, I might have to check that.


   
ReplyQuote
(@bontwoody)
Prominent Member Contributor
2769 kWhs
Joined: 2 years ago
Posts: 394
 

There is a good video explaining the pipe sizing issue here

https://renewableheatinghub.co.uk/forums/postid/29119

 

House-2 bed partial stone bungalow, 5kW Samsung Gen 6 ASHP (Self install)
6.9 kWp of PV
5kWh DC coupled battery
Blog: https://thegreeningofrosecottage.weebly.com/
Heatpump Stats: http://heatpumpmonitor.org/system/view?id=60


   
ReplyQuote
(@kenbone)
Trusted Member Member
282 kWhs
Expert
Joined: 3 months ago
Posts: 33
 

Posted by: @ecobaker

I'm in that common situation where after having a heat pump installed and the performance isn't great, I've dived into youtube and forums like this only to realise that maybe my installer didn't design/install/set up the system particularly well.

I'm in a good situation that I still owe them over £600 for some of the work, which means I can hold that over them. The question I have is about the main pipe work for the flow and return from the HP unit. I have a 3.5m section in my loft that is plastic 22mm pipe, not copper like all the other pipe work. I understand that this will have reduced internal diameter and thus flow, maybe costing me efficiency. Should I hold back final payment and insist this is changed (along with a few other niggles I've found) or is it minor enough not to worry about?

(should add Samsung Gen6 8kw, on two bedroom victorian mid terrace)

 

That's too tight IMO, we would use 28mm copper, or 32mm MLCP

 

 

Technical Manager & Professional Installer: Ultimate Renewables


   
Mars reacted
ReplyQuote