that makes sense but it's a difficult balance between being cheap when the wind blows and expensive when it doesn't. It's not a good look for any government when relatively wealthy people with heat pumps, batteries and EVs can get even wealthier while those without struggle. I don't know what the answer is though, other than "storage" but that's easier said than done.Â
@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
Posted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄Â
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄Â
Posted by: @derek-mPosted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄Â
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄Â
This is very much a chicken and egg scenario, which comes first the energy or the storage? Plans in the pipeline 800mwh battery storage 2024 and new pump storage at Coire Glas, Loch Ness and Glenmuckloch. The issues are;
"They are not cheap to build - costs can run to £500m and more. They also take a long time to construct - between five to eight years.
Developers argue the current energy market does not have the mechanisms to make such major projects attractive to investors.
In addition, they cannot bid to sell electricity through the UK government's Contracts for Difference auction system, which offers 15-year long contracts." ( https://www.bbc.com/news/uk-scotland-highlands-islands-57510870) Â
The costs can be easily recovered from the wind farm £24.5 million costs to not produce. So maybe the government should subsidise building based on cost savings from wind generation. As mentioned previously the UK grid system is broken and this appears to be a feature of delayed storage solutions.
A private members bill has just been introduced into parliament.Â
Â
@jeff I am glad now, that I took the 26p/kw fix price for a year, even if it seems crazy high after losing my 12p/kw price with Symbio.
16kw Samsung TDM ASHP. 8.4kw PV, power optimizers 20×420watt panels 6kw SolarEdge inverter.
@Jeff, that is plain crazy. Wow. There are so many people that aren't going to be able to afford that.
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
@Jeff, that's good news. It'll be interesting to see what happens over the summer, and whether October will lead to positive news when the tariff cap is revisited.
I'm still subscribed to the weekly local oil club newsletter and I see that kerosene went up again this week.Â
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
- 26 Forums
- 2,122 Topics
- 46.6 K Posts
- 41 Online
- 4,529 Members
Join Us!
Podcast Picks
Latest Posts
-
RE: Share Your Experiences with Heat Pump Manufacturer Support
@toodles , you are using homely aren’t you, and I belie...
By Terry1812 , 2 hours ago
-
RE: ASHP heat output monitoring
@carlo - welcome to the forum. I don't know about LG...
By cathodeRay , 4 hours ago
-
RE: Why do we need pressurised systems?
@old_scientist If that were the case (and it might well...
By Toodles , 8 hours ago
-
OK... I'm here. But the amount of my time needed to add...
By Transparent , 10 hours ago
-
RE: 300 Liter Tank - Do I have to heat it all?
There’s no second hand market for DHW tanks (I was told...
By Judith , 15 hours ago
-
RE: Solar Power Output – Let’s Compare Generation Figures
We had an excellent four months (11/3 to 15/7) generati...
By JulianC , 23 hours ago
-
RE: Is this just haze or something more?
I think the present somewhat cooler hazy days show the ...
By Judith , 1 day ago
-
RE: My misgivings about installing ASHP and solar panels via the ECO4 scheme...
All noted and accepted and as I say I am sorry that you...
By JamesPa , 1 day ago
-
I think it is very much me that is sitting outside the ...
By Grantmethestrength , 1 day ago
-
RE: Replacing Refrigerant on Mitsubishi Heat Pump
@davidalgarve It should just be recovered by both servi...
By dgclimatecontrol , 2 days ago
-
RE: Who's your electricity provider and what's your tariff?
Aggregators have been recognised for many years, and it...
By Transparent , 2 days ago
-
RE: Help me keep the faith with my air source heat pump installation
Great news I edited my previous post (probably af...
By JamesPa , 2 days ago
-
RE: Double or Triple Glazed Windows?
@toodles Glad to hear things are progressing well for y...
By TRBob , 2 days ago
-
How to waste energy (and time) playing with AI.
A friend of mine who subscribes to an AI service was ex...
By Toodles , 3 days ago
-
RE: Heat Pump Books For Beginners – Bodge Buster & From Zero To Heat Pump Hero
@topher you’re more than welcome to, yes. I’ll send you...
By Mars , 4 days ago
-
RE: Fitting new shower valve ..........
I’ve never taken a chance when fiddling and changing ou...
By Mars , 4 days ago
-
You should contact the council and report the unsatisfa...
By JamesPa , 4 days ago
-
RE: Benefits of an extra horizontal loop for GSHP
I would deffo install an additional slinky run, especia...
By Transparent , 4 days ago