Opinions please on me putting a 2.5kW roof mounted turbine on my garage - am I mad?
Hi folks. I have ASHP, Solar PV (5.46kW) and a 10kW battery set up. I’m thinking of putting a 2.5kW roof mounted turbine on my garage.
the garage houses the PV, Battery and Inverter already.
wind speed per second for my location is an average of 6.
my thinking is that it would be beneficial for an outlay of circa £3k because although 2.5kW isn’t huge it at least still produces at night and certainly through the winter months.
I’m thinking this could significantly offset the cost of running the ASHP and would make its money back in about 6 years.
I would put it on the back end of here.
Am I deluded?
I don’t think you’re mad. If you can afford it, and you have a property where you can add a wind turbine, that alone usually trumps an immediate RoI. I’d like to know more about the turbine you’re thinking of putting in.
@transparent knows a thing or two about turbines.
Buy Bodge Buster – Homeowner Air Source Heat Pump Installation Guide: https://amzn.to/3NVndlU
From Zero to Heat Pump Hero: https://amzn.to/4bWkPFb
Subscribe and follow our Homeowners’ Q&A heat pump podcast
@editor I’m researching models at the moment Mars, it’s not easy or obvious so far.
in terms of the cost, ScotGov offer a £2500 interest free loan, but no grants at the moment.
im thinking for £20 per month over 10 years it merits serious consideration. The price of a mobile sim contract really.
I don't know about the rules in Scotland, but I think that planning permission would be required since you also have a heat pump.
Posted by: @marvinator80I’m researching models at the moment Mars, it’s not easy or obvious so far.
Yeah, I know. It’s not a massive market so really interested to see what you discover.
Buy Bodge Buster – Homeowner Air Source Heat Pump Installation Guide: https://amzn.to/3NVndlU
From Zero to Heat Pump Hero: https://amzn.to/4bWkPFb
Subscribe and follow our Homeowners’ Q&A heat pump podcast
@derek-m I’ve seen that quoted but I think it might be a widely circulated error. Will check with planning though if I can find a model to move forward with.
Posted by: @marvinator80I’ve seen that quoted but I think it might be a widely circulated error.
If you check permitted development rules for Scotland you can ASHP x1 and a Micro Wind Turbine on a site without planning.
6.21 This provides potential opportunities for one MWT and one ASHP within the same curtilage, but not more than one of each using permitted development rights. For example, this would allow for a wind turbine to provide the electricity to power a heat pump.
When looking at turbines make sure you take in to account
Different outputs at different wind speeds not just the average.
Building effect on output - which be very dramatic unless many metres above the building, due to turbulence
Posted by: @AnonymousPosted by: @marvinator80I’ve seen that quoted but I think it might be a widely circulated error.
If you check permitted development rules for Scotland you can ASHP x1 or Wind Turbine on a site without planning. If you want both it is no longer permitted development.
When looking at turbines make sure you take in to account
Different outputs at different wind speeds not just the average.
Building effect on output - which be very dramatic unless many metres above the building, due to turbulence
yeah, I will definitely talk to planning if I can find a viable system.
why do you think they restrict it in that way. How does having a ASHP make them require planning for a small roof mounted turbine?
This may be of interest:
Is It Worth Adding a Wind Turbine to Your Home Solar Installation?
Interesting notion @marvinator80
In case you were wondering, here's how I would apply a mechanical lever to the wall of your garage in order to shake the bricks apart:
Better still, I could achieve the damage much faster if I used a varying force at the top of the pole.
Instead of it always being applied in the same direction, I would vibrate it randomly around the horizontal plane.
At some point in time it might even achieve resonance with the length of the pole above the upper bracket, which would amplify my efforts.
The foregoing explanation is based on a true story...
... which happened so often that the major UK company who developed 1kW wall-mounted wind-turbine lost their sales deal with B&Q.
Alternatively you could use a ground-mount tower.
Here's one I built using a triangular aluminium lighting truss which was being offered by the liquidator of a night-club that had closed down.
The horizontal pole close to the bottom is called the jack-stay.
You attach a rope to that in order to raise and lower the tower around the bearings at the base.
Some people then remove the jack-stay.
I decided to leave mine in place, which adds to the rigidity of the mechanism.
Save energy... recycle electrons!
- 26 Forums
- 2,102 Topics
- 46.2 K Posts
- 136 Online
- 3,388 Members
Join Us!
Latest Posts
-
RE: Ecodan consuming 100kwh per day in new build!!!
PS to above. I just looked again at the photo you post...
By JamesPa , 42 minutes ago
-
RE: Plug and play solar. Thoughts?
And we have it: DESNZ are now investigating the feasi...
By Lucia , 2 hours ago
-
RE: Compressor attempts start but fails - Nibe Fighter 2005 8kW
@skyefarmer great you located the source of the issue a...
By Mars , 6 hours ago
-
RE: Location of hot water isolation valve on cylinder
@rossowheels if you isolate the water supply in it will...
By ASHP-BOBBA , 15 hours ago
-
The Importance of Radiator Balancing for Efficient Heating: Introducing the Flow Regulating Valve
It’s fascinating to watch how low-temperature heating i...
By Mars , 24 hours ago
-
@heacol, if you're around, can you please provide some ...
By Mars , 1 day ago
-
RE: Servicing Hitachi HP in rural Somerset
I'd give GreenGenUK a call or email them: sales@greenge...
By Mars , 1 day ago
-
RE: Heating coming on when not required
I played with a max heating temp but there is a world o...
By JamesPa , 2 days ago
-
RE: Pressure drop Primary circuit
I've always regarded topping up heating systems as my j...
By JamesPa , 2 days ago
-
RE: Heat pump solutions and/or installer recommendations for France
I’d travel to France for work if you were struggling wi...
By Damon Blakemore , 2 days ago
-
RE: 5 Star Service from Havenwise
That's always a danger with any new good idea, @morgan....
By Majordennisbloodnok , 2 days ago
-
Have your say in the Renewable Heating Hub Awards
It’s time to celebrate the best (and call out the worst...
By Mars , 3 days ago
-
-
RE: Mitsubishi cycling while on chilled water output
@iaack yes there's no denying that cold air sinks! I s...
By downfield , 3 days ago
-
RE: Weather compensated secondary circuits with Biomass
@andycoo that flooring sounds ideal. Extra volume is ...
By Sune , 3 days ago
-
If you are thinking of heating on the immersion conside...
By JamesPa , 4 days ago