Heat pump install overloads home fuse - 80A limitations
I've had the DNO application back and they've passed it.
Taking out the 40A electric shower made it ok.
When I say take out, I just mean out the equation not physically off the wall, not yet anyway till heat pump is so up and running then I won't need it anyway so it'll be removed permanently .They just want it down on paper.
Still got solar, induction hob, double oven microwave and soon to be installed heat pump so it'll still be way up there.
But chatting to electrician says 80A will easily take 100A for a few hours anyway.
@njtt Great news that you've had it back approved. I found the DNO (NG in my case) were more than reasonable and very helpful.
Samsung 12kW gen6 ASHP with 50L volumiser and all new large radiators. 7.2kWp solar (south facing), Tesla PW3 (13.5kW)
Solar generation completely offsets ASHP usage annually. We no longer burn ~1600L of kerosene annually.
Yes NG for me too.
They even rang me up 2 days after application was sent in to say
"I thought you like to know it was accepted"
That's 2 dealings I've had on the phone with NG with upgrade to fuse and the heat pump and both very pleasant and quickly sorted.
Posted by: @njtAn 100A fuse would have made my life much easier.
I just applied to the DNO for a fuse upgrade as octopus after their heat pump survey said I needed one.
Getting in contact with the DNO was easy and fuse upgraded within days for free but stated their policy will only allow up to 80A fuse.
As I've already mentioned they removed neighbours 100A fuse and replaced it with an 80A
I've just addressed this issue here in the topic DIY solar upgrade.
I've spoken with the senior NGED engineer who issues their operational specifications and represents their interest at the Electricity Networks Association.
He's friendly, helpful... and deeply knowledgeable.
When he says they need to downgrade to 80A Service Fuses, then he won't have done that lightly.
As others here have pointed out, a Service Fuse is a very long time-delay device!
You can draw 100A through it for maybe an hour before it gives out.
A high proportion of homes which need to draw more than 80A (19kW) have inefficiencies within them which really ought to be addressed!
Yes, an electric shower is a very high demand appliance... more so than an EV charger.
And there's a lot of them in houses which have had additional loft insulation installed by morons on top of the electrical supply cable!
Let's hope that the need to downgrade to an 80A Service Fuse will cause more home-owners to re-evaluate their 10kW electric shower !
Let me end with a photograph showing 'loft flooring' which has been done properly:
A shows the original ceiling joists.
The span length is 4.6m, so these old 3-inch deep timbers aren't capable of taking the new floor.
B are the new floor joists which have been placed alongside the ceiling joists.
That leaves plenty of space below the new chipboard floor (C) for insulation,
and the re-routing of power cables (2.5mm² and larger) above the insulation layer.
Save energy... recycle electrons!
@transparent A concern of mine regarding the ability of an 80A fuse to carry in excess of 100A for a significant time is that if this is done regularly the fuse could deteriorate over a period of time and eventually fail (you might say this wouldn't be a bad thing).
- 26 Forums
- 2,113 Topics
- 46.4 K Posts
- 34 Online
- 3,410 Members
Join Us!
Latest Posts
-
RE: Say hello and introduce yourself
Hi @seatonian - Yes, I know Seaton, and I have the Nat...
By Transparent , 6 hours ago
-
RE: Buffers, hot water and cooling
The principal reason that heat pumps have minimum flow ...
By JamesPa , 7 hours ago
-
@seatonian got your email. Will connect you with a reco...
By Mars , 19 hours ago
-
RE: Wood burner with ASHP - direct air?
I love the new fully Viking look... best personal avata...
By Mars , 1 day ago
-
RE: No-code, plug-and-play monitoring for your heat pump
I think I have found “The One!” Waveshare ESP32-S3-POE-...
By Grantmethestrength , 2 days ago
-
@downfield and @toddles, this isn’t in the settings cur...
By Mars , 3 days ago
-
RE: Homely launched for Grant Aerona ASHP control
I haven't bought the Aerona Smart Controller (£700!) bu...
By Prunus , 3 days ago
-
RE: Antifreeze top up for my heat pump - is this a rip off?
For the record, Grant supply ethylene glycol for their ...
By Prunus , 3 days ago
-
RE: Compressor attempts start but fails - Nibe Fighter 2005 8kW
@skyefarmer amazing. Well done!
By Mars , 3 days ago
-
RE: Air source heat pump roll call – what heat pump brand and model do you have?
Ebac 5kw - Monobloc R32. Developed and made in UK - Mit...
By marcinwloch69@gmail.com , 5 days ago
-
RE: Is a Valliant Inline 6kW heater a BUS buster?
Just another thought - it might be worth thinking about...
By JamesPa , 5 days ago
-
RE: BUS Grant: removal of all other fossil fuel heat sources
@rikiarn - just have a think as to how much it will cos...
By Transparent , 6 days ago
-
Don't do much digging around.That's best left to the pr...
By Transparent , 6 days ago
-
Hi all, I was wondering if anyone had an idea of how th...
By Wh0am3ye , 6 days ago
-
RE: EBAC re-entering the ASHP market in 2023
@toodles confirm i have Ebac 5kw ASAP + homely and it w...
By marcinwloch69@gmail.com , 6 days ago
-
RE: Compute heat loss from energy used
@jamespa Ebac must be similar to Mitsubishi as they buy...
By marcinwloch69@gmail.com , 6 days ago
-
@pie_eater I have been thinking of adding cooling to my...
By TechnoGeek , 1 week ago
-
RE: Victorian Semi Retrofit / Extension ASHP and UFH Advice
Agree, but you may have a hard time convincing them, as...
By JamesPa , 1 week ago
-
RE: Seal the Deal: Don't Let Your Heat Pump Leak Energy
Hi - fyi - there's a dead image link in the 'Optimal In...
By seatonian , 1 week ago
-
RE: Ripped Off: How UK Homeowners Are Paying Gas Prices for Wind Energy
@chandykris Horses and beggars…. 😉 Toodles.
By Toodles , 1 week ago