Looking at putting in a PV system
Hi , quick intro
I am an electro/ mech engineer (dirty hands)
Midlands uk based
Looking at a PV system next year so it’s a very steep learning curve for now .
Hoping to learn and help in any way I can
Regards Jeff
Welcome to the forums Jeff. Good luck with your PV installation. Did you have any initial questions or do you have an idea of what you'll be proceeding with in terms of kit, brands and size of array?
Buy Bodge Buster – Homeowner Air Source Heat Pump Installation Guide: https://amzn.to/3NVndlU
From Zero to Heat Pump Hero: https://amzn.to/4bWkPFb
Subscribe and follow our Homeowners’ Q&A heat pump podcast
Thank you for the welcome .
Getting my head around all the components and options but …
If I get limited to G98 can I still max out on panels ?
Do I then have a big inverter with an export limiter ?
Assume 8kW panels - 2 usage , 3.6 export where does the rest go ?
if the panels are making energy I assume it has to go somewhere , battery full , export maxed, all appliances on - where does the excess go ?
Regards Jeff
Hi Jeff. Solar PV panels are now £0.50 per watt, electricity cost is only going in one direction, so max out all available roof space. Exporting power is a mugs game now, you get pennies for what you generate and your electricity provider sells that on as a massive profit. Someone else pays the price capped standard rate/kWh for what you micro generate and get paid 4p/kWh for! Don't give them the satisfaction. Use what you can, store what you can in batteries. If you have a system tank with an immersion heater, get a solar diverter like an I-boost. That will dump surplus electricity into your immersion - free hot water in summer, and very helpful even in winter. If you've maxed out on export and are generating more than you can use or store instantaneously, your system inverter will simply limit the solar PV output to 3.68kW to grid.
Batteries are not cheap, and the global demand for lithium batteries will keep prices high and handsome, but if you can't afford the initial capital outlay for battery storage, get a hybrid inverter that's battery ready and allow space for batteries. I had 3.6kW PV installed October, and planned to defer the 6.5kWh battery until Spring, but I think battery prices are going to rise next year quite significantly, so I'm getting a battery fitted early in the New Year. Won't really be of benefit to me until mid Spring however.
I think that at the moment if you have a battery system installed at the same time as solar PV, you can save the VAT on both.
Hello, I can confirm that having a battery ordered within the same contract as that for PV will allow the contractor to apply zero rate VAT to the battery system as well. Ordered on its’ own, the battery will have VAT applied to it and its’ installation cost. As to whether it is worth trying to export your surplus energy (and I stress ‘surplus’), this is indeed worthwhile with the right tariff. I am with Octopus Energy and have the Agile tariff and export using the Outgoing Agile; under this scheme, the amount paid per kW/hour will vary but I reckon my average unit rate has been in excess of 20pence. I received over £200 credit in the space of less than 2 months production last August and September. I hadn’t the means to store my excess energy then but now have a Tesla Powerwall; however though I turn on the immersion heater and try to ‘soak up’ my sunny weather excess with a convection heater, I still find that Octopus have credited me with a few pounds in a month. I have 8.1 kWp. of PV and am to have an ASHP in a few weeks and an Eddi diverter will be fitted at the same time. I am having a Sunamp Thermino ePV 210 (short of space for a large tank!) and this will be connected to the Eddi and by this means, my DHW will be catered for by PV power with grid backup if needed. Regards, Toodles
Toodles, he heats his home with cold draughts and cooks his food with magnets.
Oh! And as a sort of post script: My MCS registered installer applied to my DNO with a G99 form - took the usual long period of time but was granted and I am now able to export up to 5kW. I know of others who have a 3 phase supply and can then have plural Powerwalls allowing for greater storage and export allowance. This is an expensive game mind you and probably not worth it if your sole aim would be to export more energy! Regards, Toodles
Toodles, he heats his home with cold draughts and cooks his food with magnets.
Listed Grade 2 building with large modern extension.
LG Therma V 16kw ASHP
Underfloor heating + Rads
8kw pv solar
3 x 8.2kw GivEnergy batteries
1 x GivEnergy Gen1 hybrid 5.0kw inverter
Manual changeover EPS
MG4 EV
- 22 Forums
- 2,090 Topics
- 46.1 K Posts
- 28 Online
- 3,383 Members
Join Us!
Trusted Installers
Struggling to find a reliable heat pump installer? A poor installation can lead to inefficiencies and high running costs. We now connect homeowners with top-rated installers who deliver quality work and excellent service.
✅ Verified, trusted & experienced installers
✅ Nationwide coverage expanding
✅ Special offers available
Latest Posts
-
RE: Adding battery storage to SolarEdge PV system
@nazuro1041 I am not a grid expert like others, and the...
By ChandyKris , 2 minutes ago
-
RE: Surface mount or bury primaries for heat pump installation?
What about those pipes that include conduits for electr...
By tomasmcguinness , 46 minutes ago
-
RE: Say hello and introduce yourself
Welcome You have already done the most important thin...
By JamesPa , 51 minutes ago
-
RE: Weather compensated secondary circuits with Biomass
If anyone’s going to know the answer to this it’s @sune...
By Mars , 3 hours ago
-
RE: Commencing on an ASHP Installation Process
That outside pipework would concern me. Surely rigid se...
By benson , 15 hours ago
-
As I have reported elsewhere we turned on the cooling o...
By downfield , 18 hours ago
-
-
@el3b Hi, sorry to hear that, it is advisable to instal...
By ASHP-BOBBA , 2 days ago
-
RE: Difficult positioning of air source heat pump
@rikiarn Out of intrigue, the thread reads as though Ai...
By Sheriff Fatman , 2 days ago
-
RE: Mitsubishi Ecodan Fails to Heat Water despite temperature drop
@m1kegibson If you are able to access the service me...
By HarriUp , 2 days ago
-
RE: When will heat pumps and install prices come down?
... which of course is impossible because the world mov...
By JamesPa , 2 days ago
-
My advice is reject unless they will delete the buffer ...
By JamesPa , 3 days ago
-
RE: Battery storage to run Heat Pump.
I would be surprised if the battery chemistry is going ...
By Transparent , 3 days ago
-
RE: Air source heat pump roll call – what heat pump brand and model do you have?
@dowallydrifter OK. I would recommend you read t...
By JamesPa , 4 days ago
-
RE: Solar to power Heat Pump for DHW
Wow, how big is your heat pump that it is pulling 6kW d...
By Old_Scientist , 4 days ago