Hi folks. I have ASHP, Solar PV (5.46kW) and a 10kW battery set up. I’m thinking of putting a 2.5kW roof mounted turbine on my garage.
the garage houses the PV, Battery and Inverter already.
wind speed per second for my location is an average of 6.
my thinking is that it would be beneficial for an outlay of circa £3k because although 2.5kW isn’t huge it at least still produces at night and certainly through the winter months.
I’m thinking this could significantly offset the cost of running the ASHP and would make its money back in about 6 years.
I would put it on the back end of here.
Am I deluded?
I don’t think you’re mad. If you can afford it, and you have a property where you can add a wind turbine, that alone usually trumps an immediate RoI. I’d like to know more about the turbine you’re thinking of putting in.
@transparent knows a thing or two about turbines.
Get a copy of The Ultimate Guide to Heat Pumps
Subscribe and follow our YouTube channel!
@editor I’m researching models at the moment Mars, it’s not easy or obvious so far.
in terms of the cost, ScotGov offer a £2500 interest free loan, but no grants at the moment.
im thinking for £20 per month over 10 years it merits serious consideration. The price of a mobile sim contract really.
I don't know about the rules in Scotland, but I think that planning permission would be required since you also have a heat pump.
Posted by: @marvinator80I’m researching models at the moment Mars, it’s not easy or obvious so far.
Yeah, I know. It’s not a massive market so really interested to see what you discover.
Get a copy of The Ultimate Guide to Heat Pumps
Subscribe and follow our YouTube channel!
@derek-m I’ve seen that quoted but I think it might be a widely circulated error. Will check with planning though if I can find a model to move forward with.
Posted by: @marvinator80I’ve seen that quoted but I think it might be a widely circulated error.
If you check permitted development rules for Scotland you can ASHP x1 and a Micro Wind Turbine on a site without planning.
6.21 This provides potential opportunities for one MWT and one ASHP within the same curtilage, but not more than one of each using permitted development rights. For example, this would allow for a wind turbine to provide the electricity to power a heat pump.
When looking at turbines make sure you take in to account
Different outputs at different wind speeds not just the average.
Building effect on output - which be very dramatic unless many metres above the building, due to turbulence
Posted by: @AnonymousPosted by: @marvinator80I’ve seen that quoted but I think it might be a widely circulated error.
If you check permitted development rules for Scotland you can ASHP x1 or Wind Turbine on a site without planning. If you want both it is no longer permitted development.
When looking at turbines make sure you take in to account
Different outputs at different wind speeds not just the average.
Building effect on output - which be very dramatic unless many metres above the building, due to turbulence
yeah, I will definitely talk to planning if I can find a viable system.
why do you think they restrict it in that way. How does having a ASHP make them require planning for a small roof mounted turbine?
Interesting notion @marvinator80
In case you were wondering, here's how I would apply a mechanical lever to the wall of your garage in order to shake the bricks apart:
Better still, I could achieve the damage much faster if I used a varying force at the top of the pole.
Instead of it always being applied in the same direction, I would vibrate it randomly around the horizontal plane.
At some point in time it might even achieve resonance with the length of the pole above the upper bracket, which would amplify my efforts.
The foregoing explanation is based on a true story...
... which happened so often that the major UK company who developed 1kW wall-mounted wind-turbine lost their sales deal with B&Q.
Alternatively you could use a ground-mount tower.
Here's one I built using a triangular aluminium lighting truss which was being offered by the liquidator of a night-club that had closed down.
The horizontal pole close to the bottom is called the jack-stay.
You attach a rope to that in order to raise and lower the tower around the bearings at the base.
Some people then remove the jack-stay.
I decided to leave mine in place, which adds to the rigidity of the mechanism.
Save energy... recycle electrons!
- 26 Forums
- 2,364 Topics
- 53.6 K Posts
- 53 Online
- 6,029 Members
Join Us!
Worth Watching
Latest Posts
-
-
RE: Octopus Cosy Heat Pump Owners & Discussion Thread
@kevh it's worth remembering that many lsvs only actual...
By JamesPa , 10 hours ago
-
@majordennisbloodnok Education, Education, Education…
By Toodles , 13 hours ago
-
RE: Setback savings - fact or fiction?
Exactly. We only need to compare conditions, to decide ...
By cathodeRay , 16 hours ago
-
RE: Balancing financial efficiency and comfort using the Octopus Cosy tariff
I found because I have very low heat loss I can set bac...
By RadWhisperer , 19 hours ago
-
RE: Need Help Optimising My Rushed ECO4 Install: 12kW Bosch Heat Pump
Welcome @mickamills We too have an oversized 12kW Sa...
By Old_Scientist , 1 day ago
-
RE: My Powerwall 3 Consumes 3-4 kWh/Day in Self-Consumption: Is This Normal?
@caron I can confirm that the power usage of the PW3 is...
By Old_Scientist , 1 day ago
-
RE: Speedcomfort radiator fans
Thats true, but having tried (and succeeded) in constru...
By JamesPa , 1 day ago
-
RE: Solis S6-EH1P8K-L-PLUS – Why I Chose It and What I’ve Learned So Far
@bash brilliant, thanks for the feedback
By energy9165 , 1 day ago
-
RE: Heat Pump Heats the House… But It’s Not Cosy. Emitter Changes or System Tweak?
@alastair There I was, feeling grumpy, he said “Cheer u...
By Toodles , 1 day ago
-
RE: Grant Aerona: Is there a setting to keep the 2-port valve open during pump blockade
Depends on OAT. Mine cycles at OAT>10 and of course...
By JamesPa , 1 day ago
-
RE: New Fogstar 15.5kWh upright solution
@transparent My conclusion is as you have noted, tha...
By Bash , 1 day ago
-
RE: Mitsubishi Ecodan R290 10kW performance
And to you too. Wishing you a very enjoyable festive s...
By Sheriff Fatman , 2 days ago
-
RE: External pipework insulation
They do? But that isn't apparent from the photos we'r...
By Transparent , 2 days ago
-
RE: Say hello and introduce yourself
@velcro welcome to the forums. Please feel free start a...
By Mars , 2 days ago
-
Daikin EDLA11D3V3 DHW Settings
I have a newly installed EDLA11D3V3 which I'm still get...
By Velcro , 2 days ago
-
RE: Midea ASHP – how to set weather compensation
@curlykatie did you get sorted with this?
By MickaMills , 2 days ago
-
RE: MyVaillant Connect Regular Disconnect
Thanks. Yes, if the time is consistently 11pm every nig...
By buckwem , 3 days ago