that makes sense but it's a difficult balance between being cheap when the wind blows and expensive when it doesn't. It's not a good look for any government when relatively wealthy people with heat pumps, batteries and EVs can get even wealthier while those without struggle. I don't know what the answer is though, other than "storage" but that's easier said than done.Â
@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
Posted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄Â
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄Â
Posted by: @derek-mPosted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄Â
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄Â
This is very much a chicken and egg scenario, which comes first the energy or the storage? Plans in the pipeline 800mwh battery storage 2024 and new pump storage at Coire Glas, Loch Ness and Glenmuckloch. The issues are;
"They are not cheap to build - costs can run to £500m and more. They also take a long time to construct - between five to eight years.
Developers argue the current energy market does not have the mechanisms to make such major projects attractive to investors.
In addition, they cannot bid to sell electricity through the UK government's Contracts for Difference auction system, which offers 15-year long contracts." ( https://www.bbc.com/news/uk-scotland-highlands-islands-57510870) Â
The costs can be easily recovered from the wind farm £24.5 million costs to not produce. So maybe the government should subsidise building based on cost savings from wind generation. As mentioned previously the UK grid system is broken and this appears to be a feature of delayed storage solutions.
A private members bill has just been introduced into parliament.Â
Â
@jeff I am glad now, that I took the 26p/kw fix price for a year, even if it seems crazy high after losing my 12p/kw price with Symbio.
16kw Samsung TDM ASHP. 8.4kw PV, power optimizers 20×420watt panels 6kw SolarEdge inverter.
@Jeff, that is plain crazy. Wow. There are so many people that aren't going to be able to afford that.
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
@Jeff, that's good news. It'll be interesting to see what happens over the summer, and whether October will lead to positive news when the tariff cap is revisited.
I'm still subscribed to the weekly local oil club newsletter and I see that kerosene went up again this week.Â
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
- 26 Forums
- 2,131 Topics
- 46.8 K Posts
- 17 Online
- 5,656 Members
Join Us!
Podcast Picks
Latest Posts
-
RE: Say hello and introduce yourself
Welcome to the forum, please feel free to ask any quest...
By JamesPa , 29 minutes ago
-
RE: Heat Pump Servicing & Maintenance – Good Value or Rip-Off?
@heat-pump-newbie Yes you need F Gas engineers like us ...
By dgclimatecontrol , 2 hours ago
-
RE: New Vaillant aroTherm Plus in black - When will it come to the UK?
@editor I know it was formally announced at Ish the oth...
By PatrickVito , 7 hours ago
-
@moman0311 welcome to the forums. I've received your em...
By Mars , 8 hours ago
-
RE: Anyone still weathering it out with Agile?
Yes, but now try finding a working phone box….
By Majordennisbloodnok , 1 day ago
-
RE: Thermostat for Ideal Logic Air with 3 zone support
No harm at all in plumbing it as 3 zones, I would have ...
By JamesPa , 1 day ago
-
RE: ASHP heat output monitoring
@carlo I see there is a discussion in Facebook user gro...
By Tim441 , 1 day ago
-
RE: Flexi-Orb Heat Pump Scheme: A Game-Changer for the UK's Heat Pump Industry
MCS have set a potential trap in the new version of MCS...
By JamesPa , 2 days ago
-
RE: Who has a V2G EV installation
General comment on battery care... I guess if ev is on ...
By Tim441 , 3 days ago
-
RE: How much am I ‘saving’?
@old_scientist like for like comparisons are almost imp...
By Tim441 , 3 days ago
-
RE: Who's your electricity provider and what's your tariff?
@old_scientist There is an option in the Tesla app that...
By Toodles , 3 days ago
-
RE: Mitsu Wireless Controller and MelCloud
On the FTC5 I think this requires the dip switch on the...
By Abernyte , 3 days ago
-
RE: Octopus Cosy & Octopus EV + bidirectional smart tariff, together. What, eh?
@old_scientist me too. Just installed my new heat pump ...
By Eliuccio , 5 days ago
-
RE: Is your heat pump insured?
Yup just spoke to Privilege to inform them of my impend...
By Scalextrix , 5 days ago
-
RE: Forum updates, announcements & issues
Just to keep everyone in the loop, as the site continue...
By Mars , 5 days ago
-
RE: Fast DHW setting on Midea (Clivet) heat pump
@simon-w, is this something you could potentially assis...
By Mars , 6 days ago
-
RE: Share Your Experiences with Heat Pump Manufacturer Support
Fwiw I called my installer out for the first time a few...
By JamesPa , 6 days ago
-
RE: Long term efficiency degradation
@jamespa yes as I thought thanks. We have a reaso...
By Scalextrix , 6 days ago
-
RE: Sunamp Thermino Heat Battery
@jamespa A few days after the installation had been com...
By Toodles , 1 week ago
-
RE: Planning Permission May 2025
Fair enough. I have read the legislation and MCS020a ...
By JamesPa , 1 week ago