I have been meaning for a while to see what data has been published about Green Home Grant applications and installations, for both the Voucher scheme and the LAD schemes. These schemes, it must be remembered, are THE main way the government intend to get us Luddites to take up low carbon energy. If they fail, the whole thing fails.

Background: in late 2020, the government announced plans to install 600,000 heat pumps in the UK every year until 2028... 600,000 x 8 = 4.8m

Rather amazingly, the data is available. Here are the headline figures for England for all GHG ASHP installations:

GHG Voucher Scheme: 3,968 (to 7th(?) Feb 2022)

LAD Phase 1: 773 (to end Feb 2022)

LAD Phase 2: 116 (to end Feb 2022) (and I am presumably one of those 116 installations...)

There are around 25,000,000 dwelling in England. You can do the maths as well as I can...

Sources:

GHG Voucher scheme (Table 2.1)

LAD scheme (Tables 1.1 and 1.2)

Dwellings   

Midea 14kW (for now...) ASHP heating both building and DHW


   
Derek M, Mars, Derek M and 1 people reacted
Quote
(@hamish-mcmichael)
Eminent Member Member
71 kWhs
Joined: 2 years ago
Posts: 8
 

Hi - can you post the link to the data please?


   
ReplyQuote
(@derek-m)
Illustrious Member Moderator
13548 kWhs
Veteran Expert
Joined: 3 years ago
Posts: 4143
 
Posted by: @cathoderay

I have been meaning for a while to see what data has been published about Green Home Grant applications and installations, for both the Voucher scheme and the LAD schemes. These schemes, it must be remembered, are THE main way the government intend to get us Luddites to take up low carbon energy. If they fail, the whole thing fails.

Background: in late 2020, the government announced plans to install 600,000 heat pumps in the UK every year until 2028... 600,000 x 8 = 4.8m

Rather amazingly, the data is available. Here are the headline figures for England for all GHG ASHP installations:

GHG Voucher Scheme: 3,968 (to 7th(?) Feb 2022)

LAD Phase 1: 773 (to end Feb 2022)

LAD Phase 2: 116 (to end Feb 2022) (and I am presumably one of those 116 installations...)

There are around 25,000,000 dwelling in England. You can do the maths as well as I can...

Sources:

GHG Voucher scheme (Table 2.1)

LAD scheme (Tables 1.1 and 1.2)

Dwellings   

I'm afraid that you need to understand that when someone obtains a job at BEIS or MCS, the first requirement before they are allowed to start work is that they have to have a lobotomy, so that they are completely devoid of common sense.


   
ReplyQuote
cathodeRay
(@cathoderay)
Famed Member Moderator
6784 kWhs
Joined: 2 years ago
Posts: 1382
Topic starter  
Posted by: @hamish-mcmichael

can you post the link to the data please?

The links are there, I posted them with the original post, but for some reason they don't stand out as links. Hover over the left hand end of each of the three lines under 'Sources', and you should see them change, the cursor changes to a finger/pointer and the linked to site appears at the bottom of the screen. They work as links for me when I click them. The first two are xlsx data files, the third is a pdf.

@editor - maybe CSS not behaving as it should on the links?

Posted by: @derek-m

the first requirement before they are allowed to start work is that they have to have a lobotomy, so that they are completely devoid of common sense

Which leaves the rest of us feeling like we need lobotomies, to avoid feeling pain of living in a mad world. I suspect MCS are are major factor in why the UK ASHP industry is in the state it is.   

Midea 14kW (for now...) ASHP heating both building and DHW


   
ReplyQuote
(@hughf)
Noble Member Member
2848 kWhs
Joined: 2 years ago
Posts: 469
 

"For the rejected applications, 49 per cent were rejected as the application was deemed ineligible."

I'm sorry, what? 

Off grid on the isle of purbeck
2.4kW solar, 15kWh Seplos Mason, Outback power systems 3kW inverter/charger, solid fuel heating with air/air for shoulder months, 10 acres of heathland/woods.

My wife’s house: 1946 3 bed end of terrace in Somerset, ASHP with rads + UFH, triple glazed, retrofit IWI in troublesome rooms, small rear extension.


   
ReplyQuote
(@hughf)
Noble Member Member
2848 kWhs
Joined: 2 years ago
Posts: 469
 
Posted by: @hughf

"For the rejected applications, 49 per cent were rejected as the application was deemed ineligible."

I'm sorry, what? 

I should wait till after coffee before trying to digest that spreadsheet - I thought that was 'illegible', hence my utter confusion 🙂

Off grid on the isle of purbeck
2.4kW solar, 15kWh Seplos Mason, Outback power systems 3kW inverter/charger, solid fuel heating with air/air for shoulder months, 10 acres of heathland/woods.

My wife’s house: 1946 3 bed end of terrace in Somerset, ASHP with rads + UFH, triple glazed, retrofit IWI in troublesome rooms, small rear extension.


   
ReplyQuote



cathodeRay
(@cathoderay)
Famed Member Moderator
6784 kWhs
Joined: 2 years ago
Posts: 1382
Topic starter  

@hughf - the whole thing is eye-watering. The minute numbers of actual installs is only the headline...

 

Midea 14kW (for now...) ASHP heating both building and DHW


   
ReplyQuote
Share:

Join Us!

Latest Posts

x  Powerful Protection for WordPress, from Shield Security
This Site Is Protected By
Shield Security