that makes sense but it's a difficult balance between being cheap when the wind blows and expensive when it doesn't. It's not a good look for any government when relatively wealthy people with heat pumps, batteries and EVs can get even wealthier while those without struggle. I don't know what the answer is though, other than "storage" but that's easier said than done.Â
@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
Posted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄Â
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄Â
Posted by: @derek-mPosted by: @batalto@kev-m I would imagine some grid level storage and maybe green hydrogen production which you can then use when the network needs the power. If the cost is free who cares about round trip efficiency. Just make the hydrogen wherever you can with the extra electricity, store and burn. You could make it all summer long with all the extra PV and wind and then run down over winter - as long as you had the storage
I was reading an article several days ago, where it was stating that two wind farm operators based in Scotland, had been paid to not generate approximately 50% of their possible output, because the grid infrastructure could not handle that amount of power. 🙄Â
This of course is a product of the inadequate forward planning and total lack of joined up thinking by the powers that be. 😡
A little bit of forethought would have said, do we spend millions of pounds installing high voltage DC undersea cables from Scotland to northern England, to get this power to the consumers, or do we use the excess capacity to produce Hydrogen gas which can be stored and used for power generation when the wind is not blowing.
Why was excess generating capacity, no doubt subsidised by the consumer/tax payer, allowed to be installed in the wrong place, in the first place? 🙄Â
This is very much a chicken and egg scenario, which comes first the energy or the storage? Plans in the pipeline 800mwh battery storage 2024 and new pump storage at Coire Glas, Loch Ness and Glenmuckloch. The issues are;
"They are not cheap to build - costs can run to £500m and more. They also take a long time to construct - between five to eight years.
Developers argue the current energy market does not have the mechanisms to make such major projects attractive to investors.
In addition, they cannot bid to sell electricity through the UK government's Contracts for Difference auction system, which offers 15-year long contracts." ( https://www.bbc.com/news/uk-scotland-highlands-islands-57510870) Â
The costs can be easily recovered from the wind farm £24.5 million costs to not produce. So maybe the government should subsidise building based on cost savings from wind generation. As mentioned previously the UK grid system is broken and this appears to be a feature of delayed storage solutions.
A private members bill has just been introduced into parliament.Â
Â
@jeff I am glad now, that I took the 26p/kw fix price for a year, even if it seems crazy high after losing my 12p/kw price with Symbio.
16kw Samsung TDM ASHP. 8.4kw PV, power optimizers 20×420watt panels 6kw SolarEdge inverter.
Posted by: @andris@jeff I am glad now, that I took the 26p/kw fix price for a year, even if it seems crazy high after losing my 12p/kw price with Symbio.
Price cap going up from £1971 to £3238 for an average home a possibility?
https://www.bbc.co.uk/news/business-60506940
@Jeff, that is plain crazy. Wow. There are so many people that aren't going to be able to afford that.
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
@Jeff, that's good news. It'll be interesting to see what happens over the summer, and whether October will lead to positive news when the tariff cap is revisited.
I'm still subscribed to the weekly local oil club newsletter and I see that kerosene went up again this week.Â
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
- 26 Forums
- 2,177 Topics
- 47.9 K Posts
- 36 Online
- 5,748 Members
Join Us!
Podcast Picks
Latest Posts
-
RE: Testing new controls/monitoring for Midea Clone ASHP
Thanks- interesting and useful observations and I did n...
By benson , 2 hours ago
-
RE: Help me keep the faith with my air source heat pump installation
@jamespa yes I guess. But surely not everyone is buying...
By AdamK , 4 hours ago
-
RE: Big Changes Coming to Our Heat Pump System
General Ignorance, the universal enemy in so many ways!
By JamesPa , 5 hours ago
-
RE: Preparing for 2nd winter in new build house.
Yuch! So that's basically just an on/off control. I...
By Transparent , 7 hours ago
-
Good day everyone. I'm new here and have a few question...
By Edin67 , 11 hours ago
-
RE: Boxt Heat Pump Installation Experience
Welcome to the forums. Was there any formal in-person...
By Mars , 13 hours ago
-
RE: Say hello and introduce yourself
@transparent Morning. Just put a lengthy post on the AS...
By sbm74 , 13 hours ago
-
RE: MCS certificate SCOP vs real-world performance
That may be contributing to lower than expected SCOP. ...
By JamesPa , 24 hours ago
-
-
RE: Mitsu PAR-WT60R Wireless Controller - options
How it does it's job is something of a mystery although...
By Abernyte , 1 day ago
-
RE: Powerwall 3 or Myenergi or something else?
Yes I was thinking of outdoor, IP65 batteries with buil...
By Temperature_Gradient , 1 day ago
-
@jamespa Thanks. Yeah any adjustments Ive made at pr...
By cliffhanger , 2 days ago
-
RE: How to choose Towel Rails for an ASHP
@rob-nezard yes absolutely. Here is the link and a pho...
By GrahamF , 3 days ago
-
@mixergy Thanks for the update, I would appreciate some...
By bontwoody , 3 days ago
-
RE: Is Your Broadband Router the Weak Link in Your High-Tech Home?
Unfortunately I'm not that well connected 😂 ...
By Scalextrix , 3 days ago
-
RE: A Customer's Lessons Learnt from a Heat Pump Installation in a Large House
It is interesting to see what our new Grant Aerona 290 ...
By GrahamF , 3 days ago
-
RE: Midea ASHP – how to set weather compensation
I noticed that too and thought the same thing, but then...
By cathodeRay , 4 days ago
-
RE: Ya can’t win! It is S*d’s Law!
@old_scientist If IOF is still running next late spring...
By Toodles , 4 days ago
-
RE: Electricity price predictions
Those of you on Agile will do well tomorrow; there are ...
By Toodles , 4 days ago