Wind turbines, planning applications and implementation
May I intervene?
I think we're not comparing similar products.
I see the wind-turbine market in three quite different categories:
I think @toodles is describing wind-turbines in the first column.
They spin quite fast and are regularly touted online.
You often see them on YouTube, sometimes accompanied by extravagant claims after only a few days of use!
@knukes is far into the 3rd column.
When the wind-turbine itself is costing £38k then you really do need a professional company who know what they're doing.
I'm in the middle column.
And I'll suggest that's where @blott is likely to end up too.
There will be others reading this topic in months/years to come who would like to have a wind-turbine which produces enough output to be of use in the home, but their site isn't optimal or they're not prepared to take the risk of spending a lot of money. If there's genuine interest from others who'd like to dabble in the level of output which I've experienced (1kW - 2kW) then I can provide more details.
But it's a wide topic, and it would be best if I was answering specific questions.
Save energy... recycle electrons!
@transparent Yes, was definitely a professional install using a company called SWTCo Ltd who are specialists in installing and repairing wind turbines. I’d highly recommend them.
Something worth mentioning is that some turbines come under permitted development so don’t need planning permission as long as these conditions are met https://www.planningportal.co.uk/permission/common-projects/wind-turbines/planning-permission-stand-alone-wind-turbines
I think the SD3 from SD Wind complies for example.
Weirdly, you need planning permission if you have an ASHP though, which is why we had to go down that difficult and costly route.
I've just checked their website @knukes so I'm providing the link for SWTCo Ltd based the the Midlands.
Tom Hodkinson, the CEO, is installing one of the best-designed turbines ever produced - the Proven range from SD Wind in Scotland.
So I'm unsurprised that you're delighted with the 6kW SD6 variant. 😎
I was extremely disappointed when the original Proven company failed.
They were pushing the UK designed/manufactured market, pretty much on their own.
However, they experienced mechanical failure on a larger model they were developing, and it was enough to tip the company over the brink.
If they'd been anywhere but the UK, then I think government would've stepped in to ensure that they survived intact.
Save energy... recycle electrons!
@transparent I am only interested in a vertical turbine, fixed to my wall i.e. not stand-alone, to top up my PV system batteries in winter/cloudy weather. Any ideas on reliable manufacturers/data would be appreciated. Thanks. I would install the turbine myself.
I too would like a small, 0.5 to 1Kw vertical axis wind turbine to go at the bottom of the garden and basically top up the battery we have in the house during the windy, dark days of winter. Maybe in a couple of years time, the case for one is quite strong, since you could easily get 10 to 20 KwHr in a day given the weather we have around here. That would be a useful contribution to our electricity use at that time of year.
Responding to both @blott and @guthrie...
I'm unable to comment on the different types of vertical turbine.
Although I've read extensively about the different design approaches, I haven't compared their efficiencies or reliability.
However, I do need to provide some insights into the safety and control gear which you need to adopt for a mid-range turbine for self-install.
This is a generic diagram of the main devices you'd expect to see for a domestic turbine installation:
Note that I've placed the (rectified) output of the turbine PMG directly across the storage battery.
That automatically provides the output regulation.
Once the turbine output exceeds the battery voltage, then it will charge.
Simples!
The controller in this diagram is installed as a dump-load controller.
It has been configured with the parameters required for that particular battery.
As the battery reaches capacity, the voltage rises and the controller changes the PWM output to a dump-load (an immersion heater in this case).
In practice you will divide the components between the base of the tower and the 'cupboard' adjacent to your battery.
You'll need the capability to isolate devices for maintenance at each end of the main feed cable.
Here's a photo of the actual arrangement in the weather-proof enclosure at my tower.
These coarse (first stage) suppressors will throw any lightning strike to ground rather than allow it to pass along the thick copper wires into my home!
The back-panel is 8mm thick aluminium.
Bolted onto it are the three rectifier assemblies and the large resistors which operate as a brake.
That allows me to bring the turbine to a halt before placing a dead-short across the output of the rectifiers.
It will them be safe to lower the tower and undertake any maintenance.
The next photo shows my TriStar Load Controller, inverter etc within the battery cupboard.
This dates from a time before I changed to use LiFePO4 chemistry.
The TriStar 60A unit is a high-spec and effective controller.
But I wouldn't be using that approach now.
Electronics has moved on significantly.
I would now build my own bespoke Load Controller using an Arduino and some hefty mosFET switching to supply a dump-load.
A logic-level mosFET rated at 55v, 40A costs less than £1
You will also notice a fast-acting low-level anti-surge device, next to the analogue voltage meter.
That's connected to the same earth reference as the rest of the house mains electricity circuits.
Up until that point, every part of the turbine electronics is effectively 'floating'.
Save energy... recycle electrons!
@transparent Many thanks for your insight and the schematics. Any vertical turbine I decide on, won't be above 1st floor level, so thankfully lightning strikes won't be a likely problem. Much food for thought! Thanks again for your input.
- 22 Forums
- 2,057 Topics
- 44.9 K Posts
- 35 Online
- 3,302 Members
Join Us!
Trusted Installers
Struggling to find a reliable heat pump installer? A poor installation can lead to inefficiencies and high running costs. We now connect homeowners with top-rated installers who deliver quality work and excellent service.
✅ Verified, trusted & experienced installers
✅ Nationwide coverage expanding
✅ Special offers available
Latest Posts
-
RE: Heat Pump Manufacturers Recommending Buffer Tanks
A lot of things can work if you are SCoP chaser, do the...
By Johnmo , 58 minutes ago
-
RE: Getting the best out of a heat pump - is Homely a possible answer?
@johnmo yes that is the current workaround to access th...
By benson , 1 hour ago
-
RE: Rate the quality of your heat pump design and installation
Yes the HP is running weather compensation and I’ve lef...
By Davesoa , 4 hours ago
-
RE: IVT Greenline high pressure switch and electrical cassette errors
OK, so when the HP comes on it becomes obvious.It's on ...
By tdudgeon , 18 hours ago
-
RE: Is Your 6kW Air Source Heat Pump Really a 6kW?
@johnmo I think we’ve been trudging through the same...
By SUNandAIR , 19 hours ago
-
RE: How To Balance Radiators & the Role of the Lockshield Valve: A Homeowner's Guide
Good luck, I hope it all works out!
By JamesPa , 2 days ago
-
@johnd it's a difficult one, because we've seen instanc...
By Mars , 2 days ago
-
RE: Is your heat pump insured?
@johnmo sorry it comes across like that. The post is au...
By KevinPotts , 2 days ago
-
Win a 6-panel PV courtesy of egg and Renewable Heating Hub
Our epic giveaway just went live! Want to win a 6-pan...
By Mars , 3 days ago
-
RE: Yes, the "zoning with ASHP" topic again...
James, thanks again for your thoughtful and persistent ...
By HarryRea , 3 days ago
-
RE: Is this normal? Click of the DHW returning to space heating
So the Lone Ranger returned today! Even though we thoro...
By Grantmethestrength , 3 days ago
-
RE: Vaillant & OVO partner up to offer Heat Pump Plus
Hopefully iv done the right thing today by signing up t...
By Westkent , 3 days ago
-
RE: Battery sizing - How low can you go!
My own experience with connecting four batteries to thr...
By Transparent , 3 days ago
-
RE: Plate heat exchanger considerations
Work on 2-3 percent per degree. This is a reasonable e...
By JamesPa , 3 days ago
-
RE: Advice for ground source heat pump in new build with PV and batteries
The useful bit is the bit that specifies the heat loss ...
By JamesPa , 3 days ago
-
RE: Volumisers in Heat Pump Systems: Does Placement Matter?
You’re absolutely right that during defrost the refrige...
By Mars , 4 days ago
-
@editor thanks Mars that’s the same table I found in th...
By Gary , 4 days ago
-
RE: Tariff and charging strategy advice please
They haven't asked me to prove that I have an EV (I do)...
By JamesPa , 4 days ago
-
RE: Solar Power Output – Let’s Compare Generation Figures
Took a while to find on the OFGEN site: ”The FIT sche...
By AgentGeorge , 4 days ago