Heat pump install overloads home fuse - 80A limitations
I've had the DNO application back and they've passed it.
Taking out the 40A electric shower made it ok.
When I say take out, I just mean out the equation not physically off the wall, not yet anyway till heat pump is so up and running then I won't need it anyway so it'll be removed permanently .They just want it down on paper.
Still got solar, induction hob, double oven microwave and soon to be installed heat pump so it'll still be way up there.
But chatting to electrician says 80A will easily take 100A for a few hours anyway.
@njtt Great news that you've had it back approved. I found the DNO (NG in my case) were more than reasonable and very helpful.
Samsung 12kW gen6 ASHP with 50L volumiser and all new large radiators. 7.2kWp solar (south facing), Tesla PW3 (13.5kW)
Solar generation completely offsets ASHP usage annually. We no longer burn ~1600L of kerosene annually.
Yes NG for me too.
They even rang me up 2 days after application was sent in to say
"I thought you like to know it was accepted"
That's 2 dealings I've had on the phone with NG with upgrade to fuse and the heat pump and both very pleasant and quickly sorted.
Posted by: @njtAn 100A fuse would have made my life much easier.
I just applied to the DNO for a fuse upgrade as octopus after their heat pump survey said I needed one.
Getting in contact with the DNO was easy and fuse upgraded within days for free but stated their policy will only allow up to 80A fuse.
As I've already mentioned they removed neighbours 100A fuse and replaced it with an 80A
I've just addressed this issue here in the topic DIY solar upgrade.
I've spoken with the senior NGED engineer who issues their operational specifications and represents their interest at the Electricity Networks Association.
He's friendly, helpful... and deeply knowledgeable.
When he says they need to downgrade to 80A Service Fuses, then he won't have done that lightly.
As others here have pointed out, a Service Fuse is a very long time-delay device!
You can draw 100A through it for maybe an hour before it gives out.
A high proportion of homes which need to draw more than 80A (19kW) have inefficiencies within them which really ought to be addressed!
Yes, an electric shower is a very high demand appliance... more so than an EV charger.
And there's a lot of them in houses which have had additional loft insulation installed by morons on top of the electrical supply cable!
Let's hope that the need to downgrade to an 80A Service Fuse will cause more home-owners to re-evaluate their 10kW electric shower !
Let me end with a photograph showing 'loft flooring' which has been done properly:
A shows the original ceiling joists.
The span length is 4.6m, so these old 3-inch deep timbers aren't capable of taking the new floor.
B are the new floor joists which have been placed alongside the ceiling joists.
That leaves plenty of space below the new chipboard floor (C) for insulation,
and the re-routing of power cables (2.5mm² and larger) above the insulation layer.
Save energy... recycle electrons!
@transparent A concern of mine regarding the ability of an 80A fuse to carry in excess of 100A for a significant time is that if this is done regularly the fuse could deteriorate over a period of time and eventually fail (you might say this wouldn't be a bad thing).
- 26 Forums
- 2,131 Topics
- 46.8 K Posts
- 28 Online
- 5,656 Members
Join Us!
Podcast Picks
Latest Posts
-
RE: Anyone still weathering it out with Agile?
Yes, but now try finding a working phone box….
By Majordennisbloodnok , 14 hours ago
-
RE: Thermostat for Ideal Logic Air with 3 zone support
No harm at all in plumbing it as 3 zones, I would have ...
By JamesPa , 17 hours ago
-
RE: ASHP heat output monitoring
@carlo I see there is a discussion in Facebook user gro...
By Tim441 , 21 hours ago
-
RE: New Vaillant aroTherm Plus in black - When will it come to the UK?
@editor @sandy I tried contacting them via Whatsapp b...
By brad , 2 days ago
-
RE: Flexi-Orb Heat Pump Scheme: A Game-Changer for the UK's Heat Pump Industry
MCS have set a potential trap in the new version of MCS...
By JamesPa , 2 days ago
-
RE: Who has a V2G EV installation
General comment on battery care... I guess if ev is on ...
By Tim441 , 3 days ago
-
RE: Heat Pump Servicing & Maintenance – Good Value or Rip-Off?
@old_scientist I have never cleaned the mag filter myse...
By Toodles , 3 days ago
-
@old_scientist like for like comparisons are almost imp...
By Tim441 , 3 days ago
-
RE: Who's your electricity provider and what's your tariff?
@old_scientist There is an option in the Tesla app that...
By Toodles , 3 days ago
-
RE: Mitsu Wireless Controller and MelCloud
On the FTC5 I think this requires the dip switch on the...
By Abernyte , 3 days ago
-
RE: Octopus Cosy & Octopus EV + bidirectional smart tariff, together. What, eh?
@old_scientist me too. Just installed my new heat pump ...
By Eliuccio , 5 days ago
-
RE: Is your heat pump insured?
Yup just spoke to Privilege to inform them of my impend...
By Scalextrix , 5 days ago
-
RE: Forum updates, announcements & issues
Just to keep everyone in the loop, as the site continue...
By Mars , 5 days ago
-
RE: Fast DHW setting on Midea (Clivet) heat pump
@simon-w, is this something you could potentially assis...
By Mars , 5 days ago
-
RE: Share Your Experiences with Heat Pump Manufacturer Support
Fwiw I called my installer out for the first time a few...
By JamesPa , 6 days ago
-
RE: Long term efficiency degradation
@jamespa yes as I thought thanks. We have a reaso...
By Scalextrix , 6 days ago
-
RE: Sunamp Thermino Heat Battery
@jamespa A few days after the installation had been com...
By Toodles , 7 days ago
-
RE: Planning Permission May 2025
Fair enough. I have read the legislation and MCS020a ...
By JamesPa , 1 week ago
-
RE: How do I choose a single room MVHR to prevent losing heat in my bathroom ?
An update on the Heatsava. It is the most difficult thi...
By heat-pump-newbie , 1 week ago
-
RE: Renewables & Heat Pumps in the News
this document extensively describes (in a non-blame, ne...
By Judith , 1 week ago