@mikeh If I understood the original posting correctly, I would imagine all their installations would require PP if they mount the pumps on a 40 cm high stand!
And thinking about the roll-up of three crews, that must mean 6 or more engineers wasted half a day at least - on top of which, there would be the time taken to issue and load the stock required on site and all the appropriate paper work. I would imagine that that lot must come to at least £1,000. On top of all this, there would be the survey costs…..
Regards, Toodles
Toodles, he heats his home with cold draughts and cooks his food with magnets.
Posted by: @toodles@mikeh If I understood the original posting correctly, I would imagine all their installations would require PP if they mount the pumps on a 40 cm high stand!
And thinking about the roll-up of three crews, that must mean 6 or more engineers wasted half a day at least - on top of which, there would be the time taken to issue and load the stock required on site and all the appropriate paper work. I would imagine that that lot must come to at least £1,000. On top of all this, there would be the survey costs…..
Regards, Toodles
What's that saying "measure twice, cut once". I wonder if the 'surveyor' received a promotion to 'manager'?
There is a saying along the lines of ‘Promoted up the chain to the level of their incompetency.’ 😉 Toodles.
Toodles, he heats his home with cold draughts and cooks his food with magnets.
Posted by: @toodlesThere is a saying along the lines of ‘Promoted up the chain to the level of their incompetency.’ 😉 Toodles.
Specifically, that is the Peter Principle, @toodles, and it has a great degree of truth to it. Someone good at their job will be promoted, calling on different skills. If they are good in that new position, another promotion is likely and so it will continue until they are given a job they’re not good at. At that point, they won’t get another promotion, thereby adding another incompetent manager to the hierarchy and leaving them there.
105 m2 bungalow in South East England
Mitsubishi Ecodan 8.5 kW air source heat pump
18 x 360W solar panels
1 x 6 kW GroWatt battery and SPH5000 inverter
1 x Myenergi Zappi
1 x VW ID3
Raised beds for home-grown veg and chickens for eggs
"Semper in excretia; sumus solum profundum variat"
@pie_eater of the 4 quotes you've had, how many heat loss surveys have you paid for?? This is the part I always struggle with, how can you obtain comparable quotes if you need to outlay 3-500 quid every time?!!
@squeakysim actually none !
octopus and Aira do it for free. the last one was via a friend . In some ways paying for a properly independent view (say heat geek) , would be preferable- the line between survey and wanting a sale is very thin I think.
It may have been free for you because they have had to cancel through no fault of yours. But the customer has to sign the contract before they do the full survey and under the T&C's they reserve the right to charge for work performed (including the survey and design) if the client subsequently pulls out.Posted by: @pie_eater
...Aira do it for free.
@ivanopinion you know what - maybe I did pay a deposit! I can’t remember now, I’ll check.
It's been a busy day for calls and emails from Aira. I have be communicating with the design team today as they believe that my heat loss is very close to being suitable for the smaller 8kW unit. I am concerned the 12Kw will cycle to much. And they think the 8kw would be cheaper to run. I had been considering internally insulating my hall, so I asked if they could test the heat loss with my hall wall internally insulated. They did this and it would reduce the heat loss by more than the 400 watts needed to bring me in line with a 8kW unit. As the smaller unit costs less and would not need planning permission application work on their end, they reduced the cost which I will put towards the insulation work. We are now going ahead with the smaller 8Kw unit and and smaller 40 litre buffer, under the agreement I complete the hall insulation. I now have a much closer install date because we don't need to wait for planning permission. Install starts WC 8th August and I have some work to do to make the utility room ready for the cylinder and buffer tank. insulation will be done in Sept before heating is properly needed.
I'll be waiting for your update Mike. I live in Italy and I will get the visit from Aira on the 21st of August let's see what kind of quotation they will send me after the survey. Did they tell you if they are going to install their machine or the Valliant one?
@alecsej would love to hear what your experience will be like and how different the approach between Italy and the UK will be.
As an aside, are air to water systems popular in Italy?
Pre-order: The Ultimate Guide to Heat Pumps
Subscribe and follow our Homeowners’ Q&A heat pump podcast
Currently viewing this topic 1 guest.
- 26 Forums
- 2,158 Topics
- 47.4 K Posts
- 15 Online
- 5,736 Members
Join Us!
Podcast Picks
Latest Posts
-
RE: Heat Pump Servicing & Maintenance – Good Value or Rip-Off?
Another result and another very happy service customer:...
By ASHP-BOBBA , 56 minutes ago
-
RE: Vaillant aroTherm Plus 10kW thoughts?
@realevil the fans and fan speed / coil size (height, w...
By ASHP-BOBBA , 1 hour ago
-
RE: Mitsubishi Ecodan 11kw Defrosting Issue.
@morgan this can just be done by your sepecilist when t...
By ASHP-BOBBA , 2 hours ago
-
RE: Who’s Caved and Switched the Heating On Already?
This one is critically dependent on where you are in th...
By JamesPa , 2 hours ago
-
RE: Buffers, hot water and cooling
I agree it seems like a lot of work particularly as its...
By JamesPa , 2 hours ago
-
RE: COP is not the only measure of efficiency
@jamespetts Lots of things to unpack here so I will co...
By JamesPa , 3 hours ago
-
RE: Anyone still weathering it out with Agile?
@toodles I guess it all comes down to import averages. ...
By Tim441 , 6 hours ago
-
RE: Renewables & Heat Pumps in the News
@mike-patrick Well, if Europe is stalling partly due to...
By Toodles , 6 hours ago
-
RE: 300 Liter Tank - Do I have to heat it all?
The size of DHW tank affects the anti-legionella cycle....
By Transparent , 7 hours ago
-
RE: Heat Pump SCOPs – The Truth Might Not Be What You Think
@scalextrix Name plate capacity
By HCas , 10 hours ago
-
RE: Solar Thermal DHW and ASHP
I was originally contemplating a solar thermal installa...
By jamespetts , 11 hours ago
-
RE: Solar Power Output – Let’s Compare Generation Figures
My system installed in July 2024 has produced 6.4mWh in...
By jamespetts , 11 hours ago
-
RE: A Customer's Lessons Learnt from a Heat Pump Installation in a Large House
@judith thanks for your suggestions. Starting from col...
By GrahamF , 1 day ago
-
RE: Inventor (Midea) Heat Pump short cycling advice
I switched to "fan coil mode" to be able to set water t...
By immunity , 1 day ago
-
RE: DESNZ doing a survey which asks the right questions!
Without a survey their only source of data is probably ...
By JamesPa , 2 days ago
-
RE: Can you help with our research: solar panels, EV chargers, home batteries, heat pumps?
Just done your survey!
By Judith , 2 days ago
-
RE: Failing heat pump system - seeking thoughts on a rebuild
@cleardene-ashp just thinking about your issues here. Y...
By Judith , 2 days ago
-
RE: Midea ASHP – how to set weather compensation
@cathoderay OK let's wait and see, it sounds an interes...
By Tasos , 2 days ago
-
RE: What is the Heat Geek Guarantee?
@judith, I’m with you on Heat Geek, but there really do...
By Mars , 2 days ago