Thanks @lucia I look forward to some technical facts as well as executive summaries. The foreign reports are not separate investigations just translation from El Pais. Browsing the Spanish press (looking for trade press reports) there was some speculation on the contribution from some form of corruption. Is this something you have any fact on rather than the speculation?

2kW + Growatt & 4kW +Sunnyboy PV on south-facing roof Solar thermal. 9.5kWh Givenergy battery with AC3. MVHR. Vaillant 7kW ASHP (very pleased with it) open system operating on WC


   
ReplyQuote
(@judith)
Prominent Member Member
Joined: 2 years ago
Posts: 367
 

Here’s a little more technical detail https://cleantechnica.com/2025/06/18/inside-the-iberian-grid-collapse-what-really-went-wrong/

2kW + Growatt & 4kW +Sunnyboy PV on south-facing roof Solar thermal. 9.5kWh Givenergy battery with AC3. MVHR. Vaillant 7kW ASHP (very pleased with it) open system operating on WC


   
👍
1
ReplyQuote
Transparent
(@transparent)
Illustrious Member Moderator
Joined: 3 years ago
Posts: 2428
 

Posted by: @lucia

The first press reporting is out Here's a brief synopsis from Spanish media:

The big Blackout El Apagón: 

Yes I realise I'm picking this up a week late...
... but I don't like the way in which the Spanish Minister, Sara Aagesen, has released this to the press.

 

1: There's too much 'apportioning of blame', which isn't helpful.

When a complex situation has resulted in a national outage, you need to encourage feedback from all those involved technically.
Attacking regulatory and technical mistakes by Red Eléctrica, will have the opposite effect.

Who, from a technical background, would now want to work with a Minister who's going to throw the mess all over you when something goes wrong in future?

 

2: Text-based descriptions of power surges and fluctuations are next to useless.

Any such report must be accompanied by timelines showing the relevant data.

Only when the reader sees the periodicity and level of such fluctuations is it possible to appreciate what the Grid Operator could and could not do with the tools they had available to them at the time.

 

3: Whyever does the Spanish Government think there's anything to be gained by issuing a press release in advance of the main technical report.

Any incorrect observations and opinions that have been made by the Minister, are now almost impossible to retract!

Save energy... recycle electrons!


   
👍
1
ReplyQuote
Page 7 / 7



Share:

Join Us!

Trusted Installers

Struggling to find a reliable heat pump installer? A poor installation can lead to inefficiencies and high running costs. We now connect homeowners with top-rated installers who deliver quality work and excellent service.

✅ Verified, trusted & experienced installers
✅ Nationwide coverage expanding
✅ Special offers available

👉 Find your installer now!

Latest Posts