Geoff Ellison explains what you need to know about drilling boreholes for ground source heat pumps

Geoff Ellison

There’s a lot you need to know if you’re considering putting in a borehole for water or for your ground source heating loops. Geoff Ellison, director at Dragon Drilling, explains how deep the holes are, what they look like, how long they take to drill and what Dragon Drilling’s smallest size drilling rig is.

We would like to thank the MCS (Microgeneration Certification Scheme) for sponsoring this interview in the Renewing the Conversation series.

Enjoy the interview, and please join the conversation by leaving questions or comments below. 

Please also join our forums where you can engage in many ongoing conversations about renewable heating.

Related posts

Simon Smith explains how solar PV, home storage batteries and renewable energy systems work

Mars

Malcolm Farrow talks about a renewable liquid fuel alternative for kerosene: hydrotreated vegetable oil

Bean Beanland discusses the issues facing the heat pump industry in the UK

Leave a Comment

Click to access the login or register cheese
x  Powerful Protection for WordPress, from Shield Security
This Site Is Protected By
ShieldPRO