RE: Increasing Demand on my Electricity Supply

@toodles If you were to be making an LCT application today (which you're not), your Total Household Demand would need to be calculated.If that were fo...

7 months ago
Forum
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

We can't say that yet! We don't know the loading of your particular phase from the local substation.Very few of the 230,000 ground-mounted substatio...

7 months ago
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

I'm pretty certain that the £4.5k being quoted was on the basis of this being treated as a New Connection. That's very different to the approach use...

7 months ago
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

Just so other readers here understand what's happening: @adamk has sent me a DM with his address.That's allowed me to check the substation transform...

7 months ago
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

Ah. This timescale makes things clearer. So that quote was based on you requesting 3-phase. I wonder if the answer is different when it's NGED the...

7 months ago
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

OK. So 1967 for the original build, but when was that cable laid by WPD, when they quoted £4.5k for 3ph?

7 months ago
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

Ah... so your original supply contract was with WPD, rather than NGED, and presumably before 2021. I fully understand you feeling robbed.A lot has c...

7 months ago
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

Not necessarily @adamk It's likely/possible that the existing/ new underground cable already has 3ph conductors.NGED have been doing that for severa...

7 months ago
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

I wish we'd spoken before all that debacle happened! 1: Here's the Standards document which describes the changes to the Service Fuse. It's is...

7 months ago
Reply
RE: Boston Lincs based homeowner seeks advice on HP install

@adamk You will need to make an LCT application to your DNO (National Grid) in order to have a heat pump installed. It's free, but worthwhile doing...

7 months ago
Reply
RE: Electricity price predictions

Yes @jeff and @kilowatts_io you're largely correct It's a Cap and Flaw arrangement based on the revenues accrued by National Grid Group for operatin...

7 months ago
Page 20 / 207
Share:

Join Us!

Latest Posts

Click to access the login or register cheese
x  Powerful Protection for WordPress, from Shield Security
This Site Is Protected By
ShieldPRO