<?xml version="1.0" encoding="UTF-8"?>        <rss version="2.0"
             xmlns:atom="http://www.w3.org/2005/Atom"
             xmlns:dc="http://purl.org/dc/elements/1.1/"
             xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
             xmlns:admin="http://webns.net/mvcb/"
             xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
             xmlns:content="http://purl.org/rss/1.0/modules/content/">
        <channel>
            <title>
									Daikin 9kW to 8kW Swap Offer from Octopus - Air Source Heat Pumps (ASHPs)				            </title>
            <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/</link>
            <description>Questions and discussions about renewable heating and heat pumps</description>
            <language>en-GB</language>
            <lastBuildDate>Wed, 14 Oct 2026 13:32:34 +0000</lastBuildDate>
            <generator>wpForo</generator>
            <ttl>60</ttl>
							                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/paged/2/#post-50181</link>
                        <pubDate>Fri, 10 Oct 2025 19:48:56 +0000</pubDate>
                        <description><![CDATA[@matban I would have to check the CIBSE guide as we have a software for this but its something like 3x for Kitchen and bathroom 2x for some other areas and 1.5 across the board in other area...]]></description>
                        <content:encoded><![CDATA[<p>@matban I would have to check the CIBSE guide as we have a software for this but its something like 3x for Kitchen and bathroom 2x for some other areas and 1.5 across the board in other areas but is subject to age of building and structure, as far as I am aware there is no adjustments we are allowed to make out of the recommended guide by CIBSE, we are kind of bending the MCS rules if we allow for less but in most cases where we have measured or have accurate measurement's they are nearly always much lower once a home owner has installed double glazing, installed a better letter box or changed the door to one without a letter box hole and have changed the doors to updated energy efficient doors, insulated walls, got rid of chimney balancing air bricks, sealed off the open fires and so on. </p>
<p>What we do is measure using air pressure loss equipment and get an accurate reading or base it on educated assessments knowing the results of many other installations or homes already tested. I think this is basically what the zero disrupt HG thing is doing, taking a very large pool of data and assessing the building being assessed against 30 others almost identical, this then makes a fast set of assumptions against proven data. </p>
<p>I still think every house should be pulse tested or air tested to be accurate and then add that air loos to the calculators and say add a spare 5% max for errors, this unfortunately costs around £300 per test and there is no appetite for customers to add more cost or companies to absorbe the additional costs.</p>
<p>&nbsp;</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>ASHP-BOBBA</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/paged/2/#post-50181</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/paged/2/#post-50170</link>
                        <pubDate>Fri, 10 Oct 2025 18:03:56 +0000</pubDate>
                        <description><![CDATA[Mine was £265.  It would be cheaper for Octopus.  They could train up their surveyors, it needs an accurate floor plan which they are capturing anyway.  They probably need to just train up s...]]></description>
                        <content:encoded><![CDATA[
<p>It's increasingly clear that there is frequently problem with heat loss estimates and ach is one of the culprits.  There are some installers, including a few here, who will acknowledge that but most won't so far as I can tell and just stick to the safe (for them) MCS rules.  I was fortunate to find one who would assume ach 0.75 for my 1930s house and use my gas consumption as justification.  Few would do this though even though the evidence was clear.</p>
<p>It costs about 300 I believe to do an ach measurement and it can make a big difference. Doing it every time might be going too far however.  Personally I think installers should be obliged, wherever possible to run a sense check of calculated loss vs gas consumption or some other independent measure, and if the two don't correlate suffiently well, to reconcile, if necessary by doing further measurements including ach if appropriate.  Unless and until this becomes the norm, cases like yours will continue to occur.</p>
<p>If you do decide to negotiate I wish you luck.  Even if you don't get any further concessions you will at least have the comfort of knowing you tried.</p>
<p></p>
<p>Mine was £265.  It would be cheaper for Octopus.  They could train up their surveyors, it needs an accurate floor plan which they are capturing anyway.  They probably need to just train up some of them and only do it on houses that are perhaps a bit bigger or of certain construction types.  I bet they could get their software to work that out with AI.  Then for those that didn't have a blower test, if it comes out over 7kW they could then do a blower test just to be sure.  I guess they will stop installing Daikin's sooner or later, but people are still coming on the facebook groups saying a big Daikin has been specified.  They also need to lobby for the regulations to be cleared up rather than hiding behind them.  They are not fit for purpose if they are going to be used against customers like this.</p>
<p>&nbsp;</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>Matban</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/paged/2/#post-50170</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50168</link>
                        <pubDate>Fri, 10 Oct 2025 17:55:26 +0000</pubDate>
                        <description><![CDATA[@ashp-bobba Thank you for your reply, so does &#039;retro-fixes&#039; mean fixing up other companies bad installs?
I am going to try to knock them down.  I&#039;ve done some new break even calcs.  It woul...]]></description>
                        <content:encoded><![CDATA[<p>@ashp-bobba Thank you for your reply, so does 'retro-fixes' mean fixing up other companies bad installs?</p>
<p>I am going to try to knock them down.  I've done some new break even calcs.  It would have been <span style="font-weight: 400">6.5 years with the predicted SCOP, 8.7 with the poor SCOP and extra expenses I have incurred.  If I accept their offer it becomes 10.7 (assuming an improved SCOP), this is considerably longer than I had originally hoped. <br /><br />Oh, and do you know how much measured ACH or even ACH adjustments are used in the industry?  I get the impression they are not used much and some think that the default values are mandated.  It seems to be a huge blind spot.  Although one which Octopus, given their size and the number of issues they have had with oversized heat pumps, should have got to grips with by now.</span><span style="font-weight: 400"></span></p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>Matban</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50168</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50119</link>
                        <pubDate>Thu, 09 Oct 2025 19:50:53 +0000</pubDate>
                        <description><![CDATA[The ACH can actually make a huge difference.  My heat loss is 5kW in reality and with the correct measured ACH and more than 7.5kW with the default pre 2000 figures.  And calculations from g...]]></description>
                        <content:encoded><![CDATA[
<p>@jamespa The problem in taking the gas figure is that everyone consumes differently. I had a similar issue about my EPC. But as the surveyor correctly pointed out to me the survey isn’t for you it’s for the house. That’s why they use the average figures. If people had used my gas as a means of assessing my heatloss it would have been way too low. I’m also thinking that the heatloss arising from the ACH is usually a very small amount in comparison to the overall figure.</p>
<p></p>
<p>The ACH can actually make a huge difference.  My heat loss is 5kW in reality and with the correct measured ACH and more than 7.5kW with the default pre 2000 figures.  And calculations from gas can be OK.  I read that they would be way out so I didn't do the calculations before my heat pump install.  But when the heat pump appeared to be oversized it was the only data I had at that time so I thought I would give it a go.  I didn't use the degree day method because I had a complete temperature record from inside and outside for every day.  Because I also had temperature records for all rooms I could be confident that the hall sensor was a good average of the whole house.  I plotted all the points and used a linear regression.  And also worked out the W per degree for the absolute worst gas usage day.  Scaling that to the inside/outside temperature difference at -3.2 gave me 5kW.  That's based on my boiler running at its specified efficiency of 65% - this was an assumption.  I should also add that I was not using gas for DHW at all.  The few datapoints I had for the heat pump were aligning with the gas and by mid winter it was clear that the same calculation for the heat pump was also 5kW.  Then I got a door blower test, it turns out my 1988 house is more air tight than a new build.  I used the measured ACH in heatpunk and the MCS spreadsheet models and both came out close to 5kW. </p>
<p>&nbsp;</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>Matban</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50119</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50117</link>
                        <pubDate>Thu, 09 Oct 2025 19:36:20 +0000</pubDate>
                        <description><![CDATA[@matban If you have to concede and I am not saying you should but for less fuss if thats what you would like? If you do, reverse the offer, tell them swap the ASHP for a 6 or 8 at their cost...]]></description>
                        <content:encoded><![CDATA[<p>@matban If you have to concede and I am not saying you should but for less fuss if thats what you would like? If you do, reverse the offer, tell them swap the ASHP for a 6 or 8 at their costs and you will offer to pay the labour for their time which would cost 1/2 a day to change that part only, this would cost you around £350.00 may be a bit more. all of the rest of the issues should come under warranty. This way you get a new correct sized heat pump which should run at a better efficiency so I am thinking you further gets some saving back and hopefully resolve all of the other issues.</p>
<p>If you think you can hold out and they have not done the correct design, job and commissioning then do so as long as you can bare it and perhaps they will show goodwill. I would imagine with their buying power that they sell so many Daikin's that they could get one for free from the supplier anyways.</p>
<p>I wonder if any of the employees are on the forums here? </p>
<p>Unfortunately we are a company that complete a lot of Retro-fixes "coined name by Mars" but I am not so great in helping how to get their money back as I am not a consumer expert and TBH if our company completed an install to what you described I think I would give them a whole new system or a big chunk of the money back. </p>
<p>&nbsp;</p>
<p>&nbsp;</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>ASHP-BOBBA</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50117</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50116</link>
                        <pubDate>Thu, 09 Oct 2025 19:25:30 +0000</pubDate>
                        <description><![CDATA[@terry1812 James is correct, the ACH are often the largest factor and can change the heat loss by a 1/3.
We design often based on 1, it takes experience to look at a 40yr old building and s...]]></description>
                        <content:encoded><![CDATA[<p>@terry1812 James is correct, the ACH are often the largest factor and can change the heat loss by a 1/3.</p>
<p>We design often based on 1, it takes experience to look at a 40yr old building and see they have had improvements made over the years and now the standard air losses do not apply.  </p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>ASHP-BOBBA</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50116</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50097</link>
                        <pubDate>Thu, 09 Oct 2025 13:42:58 +0000</pubDate>
                        <description><![CDATA[Not so.  In my case it made the difference between 10.5 kW and 7kW.  There are a fair number of others who report similar eg op on this thread.
In any case a sense check doesn&#039;t just concer...]]></description>
                        <content:encoded><![CDATA[<p></p>
<p>I’m also thinking that the heatloss arising from the ACH is usually a very small amount in comparison to the overall figure.</p>
<p></p>
<p>Not so.  In my case it made the difference between 10.5 kW and 7kW.  There are a fair number of others who report similar eg op on this thread.</p>
<p>In any case a sense check doesn't just concern ach, it takes in every opportunity for the survey to be wildly out.  For surveys to be out  by a factor of 2 (as mine were) appears not to be uncommon and makes a vast difference to a 6kW house!</p>
<p>&nbsp;</p>
<p></p>
<p>The problem in taking the gas figure is that everyone consumes differently.</p>
<p></p>
<p>Yes but (a) this makes less difference than you might first think and (b) it can be factored in to an extent with a questionnaire, or almost completely if you have half hourly readings, which many will.</p>
<p>The plain fact is that the current system results sometimes in errors of a factor if 2 or more.  It makes absolutely no sense not to sense check it against a measurement if you can, which will be possible for the vast majority of retrofits.</p>
<p>If the two correlate reasonably then proceed, if they don't then find out why <em>before</em> installing the wrong heat pump and ripping up floors unnecessarily to upgrade pipework.  </p>
<p>The current system benefits the industry by providing an ironclad get out for installers at the expense of the customer.  That is immoral.</p>
<p style="text-align: right"> </p>
<p>&nbsp;</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>JamesPa</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50097</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50095</link>
                        <pubDate>Thu, 09 Oct 2025 12:54:23 +0000</pubDate>
                        <description><![CDATA[@jamespa The problem in taking the gas figure is that everyone consumes differently. I had a similar issue about my EPC. But as the surveyor correctly pointed out to me the survey isn’t for ...]]></description>
                        <content:encoded><![CDATA[@jamespa The problem in taking the gas figure is that everyone consumes differently. I had a similar issue about my EPC. But as the surveyor correctly pointed out to me the survey isn’t for you it’s for the house. That’s why they use the average figures. If people had used my gas as a means of assessing my heatloss it would have been way too low. I’m also thinking that the heatloss arising from the ACH is usually a very small amount in comparison to the overall figure.]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>Terry1812</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50095</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50088</link>
                        <pubDate>Thu, 09 Oct 2025 08:16:31 +0000</pubDate>
                        <description><![CDATA[It&#039;s increasingly clear that there is frequently problem with heat loss estimates and ach is one of the culprits.  There are some installers, including a few here, who will acknowledge that ...]]></description>
                        <content:encoded><![CDATA[<p>It's increasingly clear that there is frequently problem with heat loss estimates and ach is one of the culprits.  There are some installers, including a few here, who will acknowledge that but most won't so far as I can tell and just stick to the safe (for them) MCS rules.  I was fortunate to find one who would assume ach 0.75 for my 1930s house and use my gas consumption as justification.  Few would do this though even though the evidence was clear.</p>
<p>It costs about 300 I believe to do an ach measurement and it can make a big difference. Doing it every time might be going too far however.  Personally I think installers should be obliged, wherever possible to run a sense check of calculated loss vs gas consumption or some other independent measure, and if the two don't correlate suffiently well, to reconcile, if necessary by doing further measurements including ach if appropriate.  Unless and until this becomes the norm, cases like yours will continue to occur.</p>
<p>If you do decide to negotiate I wish you luck.  Even if you don't get any further concessions you will at least have the comfort of knowing you tried.</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>JamesPa</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50088</guid>
                    </item>
				                    <item>
                        <title>RE: Daikin 9kW to 8kW Swap Offer from Octopus</title>
                        <link>https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50087</link>
                        <pubDate>Thu, 09 Oct 2025 07:13:12 +0000</pubDate>
                        <description><![CDATA[@jamespa thank you for your thoughts.  It does seem to be a choice between a long battle with an uncertain outcome vs a financial hit but with a much more certain and timely outcome.  The ne...]]></description>
                        <content:encoded><![CDATA[@jamespa thank you for your thoughts.  It does seem to be a choice between a long battle with an uncertain outcome vs a financial hit but with a much more certain and timely outcome.  The negotiation idea is good one, nothing to lose there.  If they would go half way I would feel much better about the whole thing.  I do feel some sympathy for them in that the default ACH figures are highly misleading.  The regulations are ambiguous. If you read them from the perspective of getting a really accurate heat loss calculation then your interpretation might be that measuring ACH was essential.  If you read them from a perspective of how to get a good enough and compliant calc for the average house then you might interpret that default ACH is fine.  Without real world experience of how much ACH actually varies and the percentage of error it introduces to the calculation the latter is the more likely interpretation.  I don't think that this should be put back on me though, Octopus should fight for clearer regulation, they are in a considerably better position for that than I am.]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/">Air Source Heat Pumps (ASHPs)</category>                        <dc:creator>Matban</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/renewable-heating-air-source-heap-pumps-ashps/daikin-9kw-to-8kw-swap-offer/#post-50087</guid>
                    </item>
							        </channel>
        </rss>
		
<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Object Caching 60/66 objects using Redis
Page Caching using Disk: Enhanced (Requested URI contains query) 
Lazy Loading

Served from: renewableheatinghub.co.uk @ 2026-10-14 14:32:34 by W3 Total Cache
-->