<?xml version="1.0" encoding="UTF-8"?>        <rss version="2.0"
             xmlns:atom="http://www.w3.org/2005/Atom"
             xmlns:dc="http://purl.org/dc/elements/1.1/"
             xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
             xmlns:admin="http://webns.net/mvcb/"
             xmlns:rdf="http://www.w3.org/1999/02/22-rdf-syntax-ns#"
             xmlns:content="http://purl.org/rss/1.0/modules/content/">
        <channel>
            <title>
									National Grid consultation on upgrading etc - Electricity, Tariffs, Monitoring, Electrics &amp; Providers				            </title>
            <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/</link>
            <description>Questions and discussions about renewable heating and heat pumps</description>
            <language>en-GB</language>
            <lastBuildDate>Tue, 18 Aug 2026 05:57:27 +0000</lastBuildDate>
            <generator>wpForo</generator>
            <ttl>60</ttl>
							                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-27424</link>
                        <pubDate>Sun, 11 Feb 2024 14:15:08 +0000</pubDate>
                        <description><![CDATA[Yes @chickenbig - Vehicle to Grid (or Vehicle to Home) is the sort of &#039;consumer driven&#039; approach which needs to be evident.
But let&#039;s look at the current situation:

Only EVs with CHAdeMO...]]></description>
                        <content:encoded><![CDATA[<p>Yes @chickenbig - Vehicle to Grid (or Vehicle to Home) is the sort of 'consumer driven' approach which needs to be evident.</p>
But let's look at the current situation:<br />
<ul>
<li>Only EVs with <span><em>CHAdeMO</em></span> connectors, like the Nissan Leaf, can readily be used with V2G chargers.</li>
<li>The more common CSS connector needs a new design specification to be able to export energy from the car.</li>
<li>The V2G Trial run by OVO/Kaluza successfully implemented about 440 V2G sites before the money ran out.</li>
<li>The final report on that <a href="https://www.cenex.co.uk/projects-case-studies/sciurus/" target="_blank" rel="noopener">Sciurus Trial by Cenex</a> was brief and positive, but took none of the energy losses into account.</li>
<li>EVs use LithiumMNC batteries, which suffer greater degradation per charge-cycle than do batteries with other lithium chemistries</li>
</ul>
<p> </p>
<p>It's a lot cheaper to build static storage batteries for incorporation into the home.<br />The Achilles heel is the high profit margins and high costs of installation for domestic storage.</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>Transparent</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-27424</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-27417</link>
                        <pubDate>Sun, 11 Feb 2024 12:08:17 +0000</pubDate>
                        <description><![CDATA[Vehicle-to-grid or vehicle-to-load as mandatory for new EVs and chargers? :-) At the very least the more wealthy (those with EVs and their own charging point) should have to lead the storage...]]></description>
                        <content:encoded><![CDATA[<p></p>
<p>NGET need to see us implementing storage.</p>
<p></p>
<p>Vehicle-to-grid or vehicle-to-load as mandatory for new EVs and chargers? :-) At the very least the more wealthy (those with EVs and their own charging point) should have to lead the storage rollout!</p>
<div id="accel-snackbar" style="left: 50%;top: 50px"> </div>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>ChickenBig</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-27417</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-26156</link>
                        <pubDate>Sun, 21 Jan 2024 12:50:12 +0000</pubDate>
                        <description><![CDATA[@transparent So a distributed multi-path arrangement similar to communications networks?  This would be sensible from a robustness (and security!) standpoint, too.
For domestic customers, I...]]></description>
                        <content:encoded><![CDATA[<p>@transparent So a distributed multi-path arrangement similar to communications networks?  This would be sensible from a robustness (and security!) standpoint, too.</p>
<p>For domestic customers, I imagine the problem is co-ordinating or managing supply and demand at the local, neighbourhood level. Some thought has been given to this in the past and I believe that hooks are included in smart meter protocols to facilitate load management. There could be problems making use of these given a widespread public belief that they could be used to remotely terminate supplies.</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>IanMK13</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-26156</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-26074</link>
                        <pubDate>Sat, 20 Jan 2024 16:06:13 +0000</pubDate>
                        <description><![CDATA[Neither National Grid Electricity Transmission (NGET) nor the regional DNOs are permitted to own or control any form of storage or generation.
Storing electricity lowers the need for greate...]]></description>
                        <content:encoded><![CDATA[<p>Neither National Grid Electricity Transmission (NGET) nor the regional DNOs are permitted to own or control any form of storage or generation.</p>
<p>Storing electricity lowers the need for greater grid capacity.<br />Less power must be carried during times of peak demand because it's already being held where it's needed.</p>
<p>So if we want to avoid paying higher bills for massive grid upgrades, then NGET need to see us implementing storage.</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>Transparent</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-26074</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-26073</link>
                        <pubDate>Sat, 20 Jan 2024 16:00:14 +0000</pubDate>
                        <description><![CDATA[This post is copied across from the Welcome topic because it&#039;s more relevant here.


 Posted by: @ianmk13 
↑

Are you suggesting to National Grid that they should be targeting upgradin...]]></description>
                        <content:encoded><![CDATA[<p><em><span style="color: #333399">This post is copied across from</span> <a href="https://renewableheatinghub.co.uk/forums/postid/26064" target="_blank" rel="noopener">the Welcome topic</a> <span style="color: #333399">because it's more relevant here.</span></em></p>
<blockquote data-userid="5099" data-postid="26064" data-mention="ianmk13">
<div class="wpforo-post-quote-head">
<div class="wpforo-post-quote-author"><strong> Posted by: @ianmk13 </strong></div>
<div class="wpforo-post-quote-link"><a title="Go to original post" href="https://renewableheatinghub.co.uk/forums/rules-terms-of-use/say-hello-and-introduce-yourself/paged/82#post-26064">↑</a></div>
</div>
<p>Are you suggesting to National Grid that they should be targeting upgrading their local distribution infrastructure (at the expense of their National infrastructure, presumably).  It is local connections that seem to be the problem both for generators and consumers.</p>
<p> </p>
</blockquote>
<p>This depends on where you are in the country.</p>
<p>As we move towards an energy supply system which has thousands of generation sites spread across the regions, I believe that the grid topology should reflect this.</p>
<p>The National Grid Transmission network runs at 400kV (and a few sections at 275kV) but was designed around a few major power plants which existed in the 1930s. It's rather like a tree which picks up nutrients from relatively few main roots (routes!) and transports them to the leaves via a trunk.</p>
5983
<p>Now in 2024 we have generation from vastly more sites, most of which are not far from the leaves.</p>
<p>The historical approach by National Grid Electricity Transmission (NGET) to increase capacity has been to build a thicker trunk.<br />I contend that strategy is</p>
<ul>
<li>too expensive (more than HS2)</li>
<li>ineffective</li>
</ul>
<p>If we consider the future grid as an organic structure, then its topology should develop in similar fashion to a biological model.</p>
5984
<p>Generation and Demand sites are interlinked by a number of different pathways.</p>
<p>That organic grid is not only much cheaper, but also far more resilient to failure and malicious attack.</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>Transparent</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-26073</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-23746</link>
                        <pubDate>Mon, 27 Nov 2023 15:21:18 +0000</pubDate>
                        <description><![CDATA[mea culpa.
I have some homework to catch up on.]]></description>
                        <content:encoded><![CDATA[<p>mea culpa.</p>
<p>I have some homework to catch up on.</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>Transparent</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-23746</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-23740</link>
                        <pubDate>Mon, 27 Nov 2023 14:38:46 +0000</pubDate>
                        <description><![CDATA[-&amp;gt-&gt;given royal assent on 26 October 2023. Part 5is about the ISOP.]]></description>
                        <content:encoded><![CDATA[<p></p>
<p>Since the Energy Bill hasn't yet passed through Parliament, there is bound to be a lot of uncertainty.</p>
<p></p>
<p>https://www.gov.uk/government/collections/energy-security-bill -&gt;https://www.parliament.uk/business/news/2022/july-2022/lords-considers-energy-bill/ -&gt; https://bills.parliament.uk/bills/3311 given royal assent on 26 October 2023. Part 5 https://www.legislation.gov.uk/ukpga/2023/52/part/5/enacted is about the ISOP.</p>
<div id="accel-snackbar" style="left: 50%;top: 50px"> </div>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>ChickenBig</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/5/#post-23740</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/4/#post-23733</link>
                        <pubDate>Mon, 27 Nov 2023 13:29:37 +0000</pubDate>
                        <description><![CDATA[Since the Energy Bill hasn&#039;t yet passed through Parliament, there is bound to be a lot of uncertainty.
There will need to be a substantial number of people currently employed by NG-ESO or a...]]></description>
                        <content:encoded><![CDATA[<p></p>
<p>Perhaps they are also unclear what the strategy is, who sets it and who is accountable for delivering it!</p>
<p></p>
<p>Since the Energy Bill hasn't yet passed through Parliament, there is bound to be a lot of uncertainty.</p>
<p>There will need to be a substantial number of people currently employed by NG-ESO or a Gas Network Company who will need to be acquired by ISOP.<br />But some of the ISOP objectives will require fresh input from new people.</p>
<p>Heat Pumps is one of those issues.<br />It's quite possible that DESNZ and Ofgem will require ISOP to actually deliver on the HP Installation targets for example.<br />The present strategy of allowing MCS to control/oversee those installations isn't working:</p>
5222
<p>And removing/relaxing the rules isn't likely to help either, although it's getting some airtime on <a href="https://renewableheatinghub.co.uk/forums/postid/23626" target="_blank" rel="noopener">this other topic</a>.</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>Transparent</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/4/#post-23733</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/4/#post-23725</link>
                        <pubDate>Mon, 27 Nov 2023 11:26:39 +0000</pubDate>
                        <description><![CDATA[(As an aside, I would find going through this topic somewhat easier in a pub rather than online ... every sentence written is preceded by about 10 written and then deleted as too rambling or...]]></description>
                        <content:encoded><![CDATA[<p>(As an aside, I would find going through this topic somewhat easier in a pub rather than online ... every sentence written is preceded by about 10 written and then deleted as too rambling or disjoint with previous points.)</p>
<p></p>
<p>Don't we now have too many government-funded bodies undertaking energy-related analysis, publishing reports and recommending strategy?</p>
<p></p>
<p>Too many organisations operating in a power vacuum? It is easy to fund some research to try and get a seat at a bigger table. Perhaps they are also unclear what the strategy is, who sets it and who is accountable for delivering it! What influence does the CCC have on the Secretary of State for Net Zero?</p>
<p></p>
<p>I wonder why Ofgem wants the Government's Energy Bill to set up the <a href="https://www.gov.uk/government/publications/energy-security-bill-factsheets/energy-security-bill-factsheet-future-system-operator" target="_blank" rel="nofollow noopener">ISOP</a> as a separate entity to the Climate Change Committee?<br />What happens if their strategies diverge?</p>
<p></p>
<p>Will the ISOP create net zero strategies, or just perform planning and operation? What are the inputs to planning?</p>
<p>One thing of interest to me is that electricity and gas "operations" (and planning) would be joined together in one organisation. For instance, how will the rollout of domestic heat pumps be reflected within the internal politics? Or how will gas supply security (through drilling in UK waters) be balanced with the desire to reduce carbon emissions?</p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>ChickenBig</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/4/#post-23725</guid>
                    </item>
				                    <item>
                        <title>RE: National Grid consultation on upgrading etc</title>
                        <link>https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/4/#post-23721</link>
                        <pubDate>Mon, 27 Nov 2023 10:00:04 +0000</pubDate>
                        <description><![CDATA[Does the 6th Carbon Budget satisfy what you&#039;re after?
I wonder why Ofgem wants the Government&#039;s Energy Bill to set up the ISOP as a separate entity to the Climate Change Committee?What happ...]]></description>
                        <content:encoded><![CDATA[<p></p>
<p>Such a way of operation would require a clear and stable multi-election-cycle decarbonisation strategy within which companies and individuals operate. Who sets the strategy? What form does the strategy take?</p>
<p></p>
<p>Does the <a href="https://www.theccc.org.uk/publication/sixth-carbon-budget/" target="_blank" rel="noopener">6th Carbon Budget</a> satisfy what you're after?</p>
<p>I wonder why Ofgem wants the Government's Energy Bill to set up the <a href="https://www.gov.uk/government/publications/energy-security-bill-factsheets/energy-security-bill-factsheet-future-system-operator" target="_blank" rel="noopener">ISOP</a> as a separate entity to the Climate Change Committee?<br />What happens if their strategies diverge?</p>
<p>Don't we now have too many government-funded bodies undertaking energy-related analysis, publishing reports and recommending strategy?</p>
<ul>
<li>Dept of Energy Security &amp; Net Zero</li>
<li><a href="https://www.theccc.org.uk/" target="_blank" rel="noopener">Climate Change Committee</a></li>
<li>Independent System Operator and Planner</li>
<li>Ofgem</li>
<li><a href="https://es.catapult.org.uk/" target="_blank" rel="noopener">Energy Catapult</a></li>
<li><a href="https://www.cse.org.uk/" target="_blank" rel="noopener">Centre for Sustainable Energy</a></li>
<li><a href="https://www.regen.co.uk/" target="_blank" rel="noopener">REGEN</a></li>
<li><a href="https://www.cornwall-insight.com/" target="_blank" rel="noopener">Cornwall Insight</a></li>
</ul>
<p> </p>
<p>I suppose the main difference with ISOP is that they will actually run the networks on a daily basis, just as National Grid ESO currently does with electricity.</p>
<p>That means they own a screwdriver.</p>
<p> </p>]]></content:encoded>
						                            <category domain="https://renewableheatinghub.co.uk/forums/electricity-providers/">Electricity, Tariffs, Monitoring, Electrics &amp; Providers</category>                        <dc:creator>Transparent</dc:creator>
                        <guid isPermaLink="true">https://renewableheatinghub.co.uk/forums/electricity-providers/national-grid-consultation-on-upgrading-etc/paged/4/#post-23721</guid>
                    </item>
							        </channel>
        </rss>
		
<!--
Performance optimized by W3 Total Cache. Learn more: https://www.boldgrid.com/w3-total-cache/?utm_source=w3tc&utm_medium=footer_comment&utm_campaign=free_plugin

Object Caching 58/60 objects using Redis
Page Caching using Disk: Enhanced (Requested URI contains query) 
Lazy Loading

Served from: renewableheatinghub.co.uk @ 2026-08-18 06:57:27 by W3 Total Cache
-->